Implementation of MEWMA Control Chart in Equipment Condition Monitoring

被引:0
|
作者
Lampreia, S. S. [1 ]
Requeijo, J. G. [2 ]
Dias, J. M. [2 ]
Vairinhos, V. [1 ,3 ]
机构
[1] Ctr Invest Naval, CINAV, Naval Acad, Mech Engineer Dept, Brussels, Belgium
[2] Univ Nova Lisboa, Fac Sci & Technol, Mech & Ind Engineer Dept, P-1200 Lisbon, Portugal
[3] Univ Tecn Lisboa, Inst Super Tecn, CENTEC Ctr Naval Engn & Technol, P-1100 Lisbon, Portugal
关键词
Condition monitoring; Vibration detection and analysis; Statistical process control; Multivariate Exponential Weighted Moving Average (MEWMA) control chart;
D O I
暂无
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
The progressive degradation of presently operating electro-mechanical systems is a certain future fact. To minimize losses, maintenance costs and eventual replacements, condition monitoring should be applied to critical equipment (Condition Based Maintenance - CBM). The state of equipment can be predicted at any moment using statistical methods to analyze condition monitoring data. In this paper, collected data are vibration values, obtained at p points (p = 4 for instance) of an experimental equipment, forming p variables. When independence condition does not hold, it is suggested modeling data with Auto-Regressive Integrated Moving Average (ARIMA) models, and using the residues of the estimated model for Phase I. In Phase I, the estimation of parameters is achieved using the Hotelling T-2 control chart; only after applying the defined ARIMA model, the p variables are treated. In Phase II, equipment state is artificially degraded through induced failures and failure prediction obtained using special multivariate control charts for data statistical treatment. Assuming data independence and normality, Multivariate Exponentially Weighted Moving Average Modified (MEWMAM) control charts are applied in Phase II to data collected from an electric pump, controlling the behavior of data using this procedure. In Phase II, for non-independent data the prediction errors from the adjusted model are used instead of original data. To show that the suggested methodology can be applied to propulsion systems, simulated data from a gas turbine are used. Using these methodologies it is possible to run online condition monitoring, and act in time, to minimize maintenance costs and maximize equipment performance.
引用
收藏
页码:667 / 677
页数:11
相关论文
共 50 条
  • [31] Condition monitoring of a steam turbine generator using wavelet spectrum based control chart
    Bae, Suk Joo
    Mun, Byeong Min
    Chang, Woojin
    Vidakovic, Brani
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2019, 184 : 13 - 20
  • [32] A comparison of T2 control charts with variable sampling schemes as opposed to MEWMA chart
    Aparisi, F. (faparisi@eio.upv.es), 1600, Taylor and Francis Ltd. (41):
  • [33] Enhancing the Performance of an Adjusted MEWMA Control Chart Running on Trend and Quadratic Trend Autoregressive Models
    Karoon, Kotchaporn
    Areepong, Yupaporn
    LOBACHEVSKII JOURNAL OF MATHEMATICS, 2024, 45 (04) : 1601 - 1617
  • [34] Functioning condition monitoring of industrial equipment
    Ungureanu, N. S.
    Petrovan, A.
    Ungureanu, M.
    Alexandrescu, M.
    13TH INTERNATIONAL CONFERENCE ON TRIBOLOGY (ROTRIB'16), 2017, 174
  • [35] CONDITION MONITORING OF ROTATING EQUIPMENT.
    Elbestawi, M.A.
    Loewen, T.
    Lau, D.F.
    Research Review - Ontario Hydro, 1982, (05): : 25 - 30
  • [36] CONDITION MONITORING FOR ELECTRICAL-EQUIPMENT
    SUGARMAN, A
    SORENSEN, R
    KUMAR, B
    WANLESS, J
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1983, 44 : 446 - 448
  • [37] Condition monitoring to equipment of hydropower plant
    Teng, Xiaoyu
    Tang, Guoqing
    Dianli Xitong Zidonghue/Automation of Electric Power Systems, 2000, 24 (10): : 47 - 48
  • [38] Mining Equipment Technical Condition Monitoring
    Kuzin, Evgeny
    Bakin, Vladimir
    Dubinkin, Dmitriy
    IIIRD INTERNATIONAL INNOVATIVE MINING SYMPOSIUM, 2018, 41
  • [39] CAREFULLY PLAN EQUIPMENT CONDITION MONITORING
    DEPUE, C
    CHEMICAL ENGINEERING PROGRESS, 1991, 87 (09) : 75 - 78
  • [40] Neural networks to identify the out-of-control process variables when a MEWMA chart is employed
    Aparisi, Francisco
    Sanz, Jose
    Avendano, Gerardo
    PROCEEDINGS OF THE 16TH IASTED INTERNATIONAL CONFERENCE ON APPLIED SIMULATION AND MODELLING, 2007, : 230 - +