Cost-effective and reliable grinding schedules for inland cement

被引:0
|
作者
Sim, Thaddeus [1 ]
Cherdarchuk, Joey
Erkut, Erhan
Lalani, Sean
Mik, Kimberley
机构
[1] Univ Iowa, Tippie Coll Business, Dept Management Sci, Iowa City, IA 52242 USA
[2] Univ Alberta, Sch Business, Dept Finance & Management Sci, Edmonton, AB T6G 2R6, Canada
[3] Ferus Gas Ind Trust, Calgary, AB T2P 3C5, Canada
关键词
decision support; production planning; scheduling; linear optimization; heuristic;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The final phase of cement production at Inland Cement Edmonton is the grinding of an intermediary product called clinker. Operating the grinding machinery, or "finishing mills," requires a great deal of electrical power, which constitutes one of Inland's most significant expenses. This paper discusses a solution that provides Inland Edmonton with a tool to improve the cost-effectiveness of the grinding by directing the finishing mills' schedules, based on a variety of criteria and constraints. The project incorporates issues such as multiple products, varying power rates throughout each day and month, inconsistent productivity rates, inventory capacities, uncertain demand, and other considerations.
引用
收藏
页码:65 / 77
页数:13
相关论文
共 50 条