共 50 条
- [22] Clamping system cuts setup, production time MANUFACTURING ENGINEERING, 2004, 132 (04): : 70 - +
- [23] An alternative for improving setup times and time between failures aiming at manufacturing lead time reduction PRODUCTION ENGINEERING-RESEARCH AND DEVELOPMENT, 2021, 15 (05): : 651 - 665
- [24] An alternative for improving setup times and time between failures aiming at manufacturing lead time reduction Production Engineering, 2021, 15 : 651 - 665
- [26] Environmental issue in an alternative production–maintenance control for unreliable manufacturing system subject to degradation The International Journal of Advanced Manufacturing Technology, 2015, 77 : 383 - 398
- [27] Integrated Production Planning and Preventive Maintenance Model with Non-fixed Lead Time 2018 15TH INTERNATIONAL CONFERENCE ON CONTROL, AUTOMATION, ROBOTICS AND VISION (ICARCV), 2018, : 1653 - 1658
- [30] Rapid setup of system control in a flexible automated production system 1997 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION - PROCEEDINGS, VOLS 1-4, 1997, : 1517 - 1522