HS2 railway, UK - the parliamentary process to Royal Assent

被引:1
|
作者
Lagerweij, Lucy [1 ]
Knight, Simon [2 ]
机构
[1] HS2 Ltd, Hybrid Bill Delivery Directorate, Parliamentary Management, Birmingham, W Midlands, England
[2] HS2 Ltd, Hybrid Bill Delivery Directorate, Petit Management, Birmingham, W Midlands, England
关键词
government; infrastructure planning; project management;
D O I
10.1680/jtran.18.00037
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The parliamentary process for a hybrid bill incorporates aspects of both public and private bill procedures. The key differences from the process followed by normal government (i.e. public) legislation are a consultation on the environmental statement and select committee (SC) stages in both the House of Commons and the House of Lords. For the bulk of its time in parliament, which typically spans a number of parliamentary sessions and can even span a general election, a hybrid bill will be in SC in one house or the other. The bill for phase 1 of HS2 completed its passage through parliament faster than the bill for Crossrail had, despite being significantly more contentious both nationally and locally, and receiving nearly six times as many objections (known as petitions). By any objective measure, the promotion of the bill was a success. This paper will explain the process for passing a hybrid bill in generic terms, as well as expanding to refer to the specific processes undertaken by High Speed Two (HS2) Limited to manage the SC, stakeholders, costs and associated governance in its delivery of the High Speed Two (London-West Midlands) Act.
引用
收藏
页码:67 / 74
页数:8
相关论文
共 50 条