Water-energy nexus under uncertainty: Development of a hierarchical decision-making model

被引:16
|
作者
Ma, Y. [1 ]
Li, Y. P. [1 ,2 ]
Huang, G. H. [1 ,2 ]
Liu, Y. R. [1 ]
机构
[1] Beijing Normal Univ, Sch Environm, Beijing 100875, Peoples R China
[2] Univ Regina, Inst Energy Environm & Sustainable Communities, Regina, SK S4S 0A2, Canada
关键词
Bi-level programming; Dual uncertainties; Stochastic analysis; Water-energy nexus; Water-resource allocation; RESOURCES MANAGEMENT; PROGRAMMING-MODEL; INTERVAL; OPTIMIZATION; ALLOCATION; OPTIMALITY; SYSTEMS;
D O I
10.1016/j.jhydrol.2020.125297
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In this study, an interval stochastic bi-level programming (ISBP) method is developed for planning the water-energy nexus (WEN) system. In ISBP, interval-parameter programming (IPP) and two-stage stochastic programming (TSP) are introduced into a bi-level programming (BP) framework. ISBP can tackle dual uncertainties expressed as probability distributions and interval values as well as balance the tradeoff between two-level decision makers. An ISBP-WEN model is then formulated for planning the WEN system of Jinan (the capital of Shandong province, China), in which the upper-level model aims to maximize system benefit and the lower-level model aims to minimize the electricity consumed for water allocation. Major findings are: (i) dual uncertainties can affect the city's water-allocation pattern and lead to different amounts of water shortage and electricity consumption; (ii) [25.5, 31.3]% of water-allocation target cannot be satisfied under the low water-flow level, implying that the city would face serious water shortage; (iii) compared with surface water and reclaimed water, groundwater is the scarcest source for the city and the proportion of groundwater deficit would be [41.2, 49.9]% under the low water-flow level; (iv) compared with the traditional single-level model, electricity consumption from ISBP-WEN would be reduced by [3.9, 5.1]%. These findings can help managers to identify the desired strategy between different stakeholders and provide numerical information for planning the WEN system under dual uncertainties.
引用
收藏
页数:12
相关论文
共 50 条
  • [41] Alternative risk measure for decision-making under uncertainty in water management
    Xu, Yueping
    Tung, Yeou-Koung
    Li, Jia
    Niu, Shaofeng
    PROGRESS IN NATURAL SCIENCE-MATERIALS INTERNATIONAL, 2009, 19 (01) : 115 - 119
  • [42] Multifunctional nanomaterials at the water-energy nexus
    Aich, Nirupam
    ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 2015, 250
  • [44] The water-energy nexus in the Middle East: Infrastructure, development, and conflict
    Weinthal, Erika
    Sowers, Jeannie
    WILEY INTERDISCIPLINARY REVIEWS-WATER, 2020, 7 (04):
  • [45] UNCERTAINTY PROBLEM BY DECISION-MAKING ON LARGE ENERGY SYSTEM-DEVELOPMENT
    BELAYEV, LS
    VESTNIK AKADEMII NAUK SSSR, 1976, (10) : 68 - 75
  • [46] Development of a Sequential Decision-Making Model for Controlling Multiple Air Pollutants Under Stochastic Uncertainty
    Ying Lv
    Guohe Huang
    Yongping Li
    Zhifeng Yang
    Wei Sun
    Water, Air, & Soil Pollution, 2012, 223 : 443 - 465
  • [47] Development of a Sequential Decision-Making Model for Controlling Multiple Air Pollutants Under Stochastic Uncertainty
    Lv, Ying
    Huang, Guohe
    Li, Yongping
    Yang, Zhifeng
    Sun, Wei
    WATER AIR AND SOIL POLLUTION, 2012, 223 (01): : 443 - 465
  • [48] Sensitivity of Water-Energy Nexus to dam operation: A Water-Energy Productivity concept
    Basheer, Mohammed
    Elagib, Nadir Ahmed
    SCIENCE OF THE TOTAL ENVIRONMENT, 2018, 616 : 918 - 926
  • [49] Drought and the water-energy nexus in Texas
    Scanlon, Bridget R.
    Duncan, Ian
    Reedy, Robert C.
    ENVIRONMENTAL RESEARCH LETTERS, 2013, 8 (04):
  • [50] China's water-energy nexus
    Kahrl, Fredrich
    Roland-Holst, David
    WATER POLICY, 2008, 10 : 51 - 65