The Excavating Stability study of a Power Station Underground Plan

被引:0
|
作者
Wei, Zou [1 ]
机构
[1] Jilin Univ, Coll Construct Engn, Changchun 130061, Peoples R China
关键词
stability; power station; FLAC;
D O I
10.4028/www.scientific.net/AMM.457-458.1474
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this study, rock stability psychoanalytic theories were concluded, excavation of the underground workshop were done by applying geotechnical common software FLAC3D, then the adjoining rock displacements and transformation rules were simulated and study, and then bolts were used to support the rock, with the study of stress and strain rules and we can analyze and evaluate the effects of the bolting.
引用
收藏
页码:1474 / 1478
页数:5
相关论文
共 50 条
  • [21] Study on hydraulic stability of Francis turbine of Three Gorges Power Station
    Tian, Zi-qin
    Liu, Jing-wang
    Renmin Changjiang/Yangtze River, 2000, 31 (05): : 1 - 3
  • [22] Danginri Power Station Goes Underground; Culture Moves in on Top
    不详
    SPACE, 2013, (552): : 7 - 7
  • [23] Investigation of cavern distortion in the gordon underground power station, Tasmania
    Hydro Tasmania Consulting, Australia
    Aust. Geomech. J., 2008, 2 (1-7):
  • [24] Why offered thermal power station refer to floor underground
    Chernegov, Yu.A.
    Ugol', 2005, (07):
  • [25] Selection and influence of turbine installation elevation for underground power station
    Yang, Jiandong
    Chen, Jianzhi
    Lai, Xu
    Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2000, (01): : 86 - 91
  • [26] TRIAL EXCAVATION FOR UNDERGROUND CAVERNS AT DINORWIG POWER-STATION
    DOUGLAS, TH
    RICHARDS, LR
    ARTHUR, LJ
    GEOTECHNIQUE, 1983, 33 (04): : 407 - 431
  • [27] Primary Engineering Geological for Shuibuya Underground Power Station and Their Treatment
    Liu, Jinghua
    Zhou, Jianjun
    ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 : 608 - +
  • [28] Study for Highway 407 transitway system plan and station site plan
    Gorys, Julius
    Poulos, Nicholas
    Ruggero, Al
    Transportation Research Record, 1999, (1669): : 3 - 12
  • [29] Study on plan of track lines in marshalling station
    Wang, Shidong
    Zheng, Li
    Zhang, Zhihai
    2007 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2007, : 852 - 856
  • [30] Stability analysis of determined blocks in the underground powerhouse of guandi hydropower station
    Lu, B.
    Ding, X. L.
    Dong, Z. H.
    Wu, A. Q.
    ADVANCES IN DISCONTINUOUS NUMERICAL METHODS AND APPLICATIONS IN GEOMECHANICS AND GEOENGINEERING, 2012, : 219 - 225