共 50 条
- [21] Study on hydraulic stability of Francis turbine of Three Gorges Power Station Renmin Changjiang/Yangtze River, 2000, 31 (05): : 1 - 3
- [23] Investigation of cavern distortion in the gordon underground power station, Tasmania Aust. Geomech. J., 2008, 2 (1-7):
- [25] Selection and influence of turbine installation elevation for underground power station Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2000, (01): : 86 - 91
- [26] TRIAL EXCAVATION FOR UNDERGROUND CAVERNS AT DINORWIG POWER-STATION GEOTECHNIQUE, 1983, 33 (04): : 407 - 431
- [27] Primary Engineering Geological for Shuibuya Underground Power Station and Their Treatment ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 : 608 - +
- [28] Study for Highway 407 transitway system plan and station site plan Transportation Research Record, 1999, (1669): : 3 - 12
- [29] Study on plan of track lines in marshalling station 2007 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2007, : 852 - 856
- [30] Stability analysis of determined blocks in the underground powerhouse of guandi hydropower station ADVANCES IN DISCONTINUOUS NUMERICAL METHODS AND APPLICATIONS IN GEOMECHANICS AND GEOENGINEERING, 2012, : 219 - 225