Facade and roof construction for a nuclear power plant

被引:0
|
作者
Urban, Hagen [1 ]
机构
[1] Zublin Stahlbau GmbH, D-01996 Hosena, Germany
关键词
D O I
10.1002/stab.200910045
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Facade and root construction for a nuclear power plant. For the new building of a nuclear power plant, different special technical problems are to be handled with regard to the facade and roof constructions. On the one hand, these are caused by the local climatic conditions, while on the other hand a special demand with regard to operational safety is associated with the new building of a nuclear power plant. The static-construction demands, the requirements from the construction physics and as well as the erection conditions required the further development of established facade structures and their testing in laboratories and testing institutes before production commencement. The already largely realized building envelope of the conventional area - the "Turbine Island" - is the subject of this paper Zublin Stahlbau GmbH, an IFBS and DStV member also implemented the steel construction works in the Turbine Island, as well as the facade work. Synergies were generated from the combination of both trade sectors, in particular in the planning of the interfaces and the intermeshing of assembly process sequences on site. In sum, with the Turbine Island, approx. 90000 m(2) profiled sheet metal units are laid and approx. 4000 tons steel structures mounted.
引用
收藏
页码:324 / 333
页数:12
相关论文
共 50 条
  • [31] NUCLEAR-POWER PLANT CONSTRUCTION AND OPERATING EXPERIENCES IN JAPAN
    ITO, N
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1977, 25 : 6 - 8
  • [32] ENVIRONMENTAL MONITORING OF CONSTRUCTION IMPACTS AT A NUCLEAR-POWER PLANT
    SMITH, BW
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1978, 28 (JUN): : 684 - 684
  • [33] The application of virtual reality technology to the conical roof lifting for the AN 000 nuclear power plant
    Shen Yang
    Shen Hongwei
    PROCEEDINGS OF THE 21ST INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING - 2013, VOL 2, 2014,
  • [34] WALL AND ROOF CONSTRUCTION FOR PROCESS AND PLANT BUILDINGS
    SCHWARTZ, M
    CHEMICAL ENGINEERING, 1984, 91 (02) : 77 - 81
  • [35] MODULAR DESIGN REDUCES NUCLEAR-POWER PLANT CONSTRUCTION TIME
    KALK, WA
    RENNER, WA
    WADE, GE
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1973, 17 (NOV): : 386 - 386
  • [36] MATHEMATICAL MODELING FOR CONTINGENCY DETERMINATION FOR NUCLEAR POWER PLANT CONSTRUCTION PROJECTS
    Zhao, Wei
    Xu, Shenjun
    PROCEEDINGS OF THE 22ND INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING - 2014, VOL 6, 2014,
  • [37] COSTS OF NUCLEAR-POWER-PLANT CONSTRUCTION - THEORY AND NEW EVIDENCE
    MARSHALL, JM
    NAVARRO, P
    RAND JOURNAL OF ECONOMICS, 1991, 22 (01): : 148 - 154
  • [38] Construction and Application of Functional Equipment Group in Qinshan Nuclear Power Plant
    Zhong X.
    Yu L.
    Lü S.
    Mu W.
    Zhu Y.
    Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2021, 55 : 1 - 6
  • [39] Seismic and Structure Analysis of a Temporary Rack Construction in a Nuclear Power Plant
    Kim, Heung Tae
    Lee, Young Shin
    TRANSACTIONS OF THE KOREAN SOCIETY OF MECHANICAL ENGINEERS A, 2011, 35 (10) : 1265 - 1271
  • [40] Identifying and Categorizing Risks Incumbent in US Nuclear Power Plant Construction
    Sherman, Rachael
    Parrish, Kristen
    Lamanna, Anthony
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (04)