共 50 条
- [33] Hybrid metaheuristics for unrelated parallel machine scheduling with sequence-dependent setup times The International Journal of Advanced Manufacturing Technology, 2009, 43 : 161 - 169
- [34] Due-date scheduling on parallel machines with job splitting and sequence-dependent major/minor setup times The International Journal of Advanced Manufacturing Technology, 2012, 59 : 325 - 333
- [35] Hybrid metaheuristics for unrelated parallel machine scheduling with sequence-dependent setup times INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 43 (1-2): : 161 - 169
- [37] Due-date scheduling on parallel machines with job splitting and sequence-dependent major/minor setup times INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 59 (1-4): : 325 - 333
- [39] Scheduling hybrid flow shop with sequence-dependent setup times and machines with random breakdowns The International Journal of Advanced Manufacturing Technology, 2009, 42 : 189 - 201
- [40] Scheduling hybrid flow shop with sequence-dependent setup times and machines with random breakdowns INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 42 (1-2): : 189 - 201