Shortening lead-time from project initiation to delivery: A study of quick school and prison capacity provision

被引:5
|
作者
Okland, Andreas [1 ]
Johansen, Agnar [2 ]
Olsson, Nils O. E. [3 ]
机构
[1] Norwegian Univ Sci & Technol, Fak Ingeniorvitenskap & Teknol Trondheim, Trondheim, Norway
[2] SINTEF Teknol & Samfunn, Trondheim, Norway
[3] Norwegian Univ Sci & Technol, Dept Mech & Ind Engn, Trondheim, Norway
关键词
Standardization; Sustainability; Public projects; Delivery models; Procurement models; SUSTAINABLE DEVELOPMENT; CONSTRUCTION; SYSTEMS; PERFORMANCE; MANAGEMENT; OWNERSHIP; SECTOR;
D O I
10.1108/IJMPB-07-2017-0073
中图分类号
F [经济];
学科分类号
02 ;
摘要
Purpose Standardizing the development, planning and construction of public building projects can contribute to timely and efficient project delivery. This is especially relevant when there are urgent needs for capacity. The purpose of this paper is to share the experiences from the development of standardized concepts for school extensions and prison building in Norway. Design/methodology/approach The research questions posed in this paper are on the interaction between public entities project delivery models and standardizing building types and the construction method. To investigate the research questions, the paper presents the findings from two case studies: school and prison development and construction projects. It is based on a literature review, semi-structured interviews, document studies and quantitative data on time and cost for the planning and construction phases. Findings Standardization and use of modularized building systems can contribute to shortened delivery time by reducing the duration of both the planning and construction phase. The most significant time reduction resulted from less time spent on quality assurance of cost estimates prior to the funding of the projects. Project costs increased in the school case, but were reduced in the prison case. An important challenge faced in both cases is a shallow pool of capable suppliers; the actors have approached the challenge with different strategies, yet neither actor has been successful in their attempts. Originality/value The paper provides empirical data to add to the collective knowledge on the project management aspects of using standardized project delivery models and standardized (modular) building. However, by emphasizing the interaction between project delivery models and standardization of the planning and execution of the projects, additional insight into the benefits and challenges are highlighted.
引用
收藏
页码:625 / 649
页数:25
相关论文
共 4 条
  • [1] Lead-time reduction in manufacturing - from initiation to realization
    Wedel, John E.
    Doktorsavhandlingar vid Chalmers Tekniska Hogskola, 1996, (1209):
  • [2] Barriers and Enablers for Shortening Software Development Lead-Time in Mechatronics Organizations: A Case Study
    Mahally, Mahshad M.
    Staron, Miroslaw
    Bosch, Jan
    2015 10TH JOINT MEETING OF THE EUROPEAN SOFTWARE ENGINEERING CONFERENCE AND THE ACM SIGSOFT SYMPOSIUM ON THE FOUNDATIONS OF SOFTWARE ENGINEERING (ESEC/FSE 2015) PROCEEDINGS, 2015, : 1006 - 1009
  • [3] Integrating Lean Six Sigma and Discrete-Event Simulation for Shortening the Appointment Lead-Time in Gynecobstetrics Departments: A Case Study
    Ortiz-Barrios, Miguel
    McClean, Sally
    Jimenez-Delgado, Genett
    Martinez-Sierra, David Enrique
    DIGITAL HUMAN MODELING AND APPLICATIONS IN HEALTH, SAFETY, ERGONOMICS AND RISK MANAGEMENT. HUMAN COMMUNICATION, ORGANIZATION AND WORK, DHM 2020, PT II, 2020, 12199 : 378 - 389
  • [4] First Aid Training for Drug Overdose in Opioid Addicts and Provision of Take-Home Naloxone on Release from Prison: Feasibility Study from the Bavarian Model Project
    Wodarz-von Essen, Heike Jutta
    Wolstein, Joerg
    Pogarell, Oliver
    Wodarz, Norbert
    GESUNDHEITSWESEN, 2023, 85 (06) : 568 - 572