Lead-time reduction in manufacturing - from initiation to realization

被引:0
|
作者
Wedel, John E.
机构
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] Analysing the hindrances to the reduction of manufacturing lead-time and their associated environmental pollution
    Fahimnia, Behnam
    Marian, Romeo
    Motevallian, Behzad
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL TECHNOLOGY AND MANAGEMENT, 2009, 10 (01) : 16 - 25
  • [2] Lead-time reduction through flexible routing: application to Shape Deposition Manufacturing
    Pinilla, JM
    Prinz, FB
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2003, 41 (13) : 2957 - 2973
  • [3] REDUCTION OF MANUFACTURING LEAD-TIME THROUGH SELECTION OF MACHINING RATE AND UNIT HANDLING SIZE
    EGBELU, PJ
    ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1991, 21 (01): : 21 - 34
  • [4] Lead-time reduction: The search for competitive advantage
    Tersine, RJ
    Hummingbird, EA
    INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 1995, 15 (02) : 8 - &
  • [5] Lead-time and risk reduction assessment of a sterile drug product manufacturing line using simulation
    Spindler, Jannik
    Kec, Thomas
    Ley, Thomas
    COMPUTERS & CHEMICAL ENGINEERING, 2021, 152
  • [6] 'LEAD-TIME'
    KLEINSCHMIDT, E
    NEW ENGLAND REVIEW-MIDDLEBURY SERIES, 1991, 13 (3-4): : 275 - 276
  • [7] LEAD-TIME VARIABILITY REDUCTION IN STOCHASTIC INVENTORY MODELS
    PAKNEJAD, MJ
    NASRI, F
    AFFISCO, JF
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1992, 62 (03) : 311 - 322
  • [8] SIMULATED INPUT OUTPUT - THE KEY TO MANUFACTURING LEAD-TIME CONTROL
    TOTTEN, AK
    APICS 32ND INTERNATIONAL CONFERENCE PROCEEDINGS : SOLUTIONS FOR PROGRESS, 1989, : 92 - 93
  • [9] Lead-Time Effect Comparison of Additive Manufacturing with Conventional Alternatives
    Kurdve, Martin
    Persson, Karl-Eric
    Widfeldt, Magnus
    Berglund, Johan
    Drott, Alexander
    SPS2020, 2020, 13 : 672 - 679
  • [10] Batch sizes and lead-time performance in flexible manufacturing systems
    Millar, HH
    Yang, T
    INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, 1996, 8 (01): : 5 - 21