共 50 条
- [21] Evaluation of Acceptance Tests on the 1300 MW Unit at Philippsburg Nuclear Power Station (KKP 2). VGB-Kraftwerkstechnik, 1987, 67 (02): : 103 - 109
- [22] Gitaru Unit No. 1 - 80 MW in three years HYDROPOWER DEVELOPMENTS - NEW PROJECTS AND REHABILITATION, 2000, 2000 (17): : 65 - 70
- [23] DESIGN AND ENGINEERING OF A 3-UNIT 1300-MW(E) NUCLEAR-POWER PLANT TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1978, 29 (SEP): : 151 - 160
- [25] The Operation of the 600-MW Super-Critical CFB Boiler Unit CLEAN COAL TECHNOLOGY AND SUSTAINABLE DEVELOPMENT, 2016, : 283 - 286
- [26] Evolution over thirty years of the profile of inpatients with reactive arthritis in a tertiary rheumatology unit REUMATOLOGIA CLINICA, 2018, 14 (01): : 36 - 39