Risk Assessment of a Battery-Powered High-Speed Ferry Using Formal Safety Assessment

被引:10
|
作者
Wang, Haibin [1 ]
Boulougouris, Evangelos [1 ]
Theotokatos, Gerasimos [1 ]
Priftis, Alexandros [1 ]
Shi, Guangyu [1 ]
Dahle, Mikal [2 ]
Tolo, Edmund [3 ]
机构
[1] Univ Strathclyde, Maritime Safety Res Ctr, Dept Naval Architecture Ocean & Marine Engn, Glasgow G4 0LZ, Lanark, Scotland
[2] Kolumbus AS, Jernbaneveien 9, N-4005 Stavanger, Norway
[3] Fjellstrand AS, Omavegen 225, N-5632 Omastrand, Norway
基金
欧盟地平线“2020”;
关键词
fully electric ship; battery-powered system; risk assessment; hazard identification; event tree analysis cost-benefit assessment; LIFE-CYCLE ASSESSMENT; ION BATTERIES; HYBRID; PROPULSION; EFFICIENCY; SYSTEMS; STORAGE; SHIPS;
D O I
10.3390/safety6030039
中图分类号
R1 [预防医学、卫生学];
学科分类号
1004 ; 120402 ;
摘要
Fully electric ships have been widely developed, investigated and evaluated by the maritime industry as a potential solution to respond to the emissions control required according to the International Maritime Organization (IMO). This study aims at presenting a novel approach to evaluate the safety level of a battery-powered high speed catamaran. Following the Formal Safety Assessment procedure, the risk assessment of the considered ship was conducted leading to the identification of the involved hazards along with the estimation of their frequency and consequences thus allowing for the identification of the most severe hazards. Fault tree analysis is carried out for and the identified top events followed by an event tree analysis to estimate the risk and safety level of the vessel. Furthermore, a cost-benefit assessment is conducted to evaluate the financial impact of selected risk control options. The derived results indicate that the application of battery power systems for high speed ferries exhibits low and acceptable accident frequencies. It is also supported the current regulation to carry out mandatory risk assessment for battery-powered ships.
引用
收藏
页数:38
相关论文
共 50 条
  • [31] Safety assessment of a short span railway bridge for high-speed traffic using simulation techniques.
    Rocha, J. M.
    Henriques, A. A.
    Calcada, R.
    ENGINEERING STRUCTURES, 2012, 40 : 141 - 154
  • [32] On a systematic perspective on risk for formal safety assessment (FSA)
    Montewka, Jakub
    Goerlandt, Floris
    Kujala, Pentti
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2014, 127 : 77 - 85
  • [33] Uncertainty Analysis of the Estimated Risk in Formal Safety Assessment
    Sun, Molin
    Zheng, Zhongyi
    Gang, Longhui
    SUSTAINABILITY, 2018, 10 (02)
  • [34] Hydrogen vs. Batteries: Comparative Safety Assessments for a High-Speed Passenger Ferry
    Mylonopoulos, Foivos
    Boulougouris, Evangelos
    Trivyza, Nikoletta L.
    Priftis, Alexandros
    Cheliotis, Michail
    Wang, Haibin
    Shi, Guangyu
    APPLIED SCIENCES-BASEL, 2022, 12 (06):
  • [35] STABILITY ASSESSMENT OF HIGH-SPEED RAILWAY USING ADVANCED INSAR TECHNIQUE
    Qin, Xiaoqiong
    Liao, Mingsheng
    Shi, Xuguo
    Yang, Mengshi
    2016 IEEE INTERNATIONAL GEOSCIENCE AND REMOTE SENSING SYMPOSIUM (IGARSS), 2016, : 6010 - 6013
  • [36] CONCEPTUAL ASSESSMENT OF 2 HIGH-SPEED ROTORCRAFT
    RUTHERFORD, JW
    OROURKE, MJ
    LOVENGUTH, MA
    MITCHELL, CA
    JOURNAL OF AIRCRAFT, 1993, 30 (02): : 241 - 247
  • [37] Economical assessment of commercial high-speed transport
    Margaretic P.
    Steelant J.
    CEAS Aeronautical Journal, 2018, 9 (4) : 747 - 764
  • [38] Energy and Environmental Assessment of High-Speed Roundabouts
    Ahn, Kyoungho
    Kronprasert, Nopadon
    Rakha, Hesham
    TRANSPORTATION RESEARCH RECORD, 2009, (2123) : 54 - 65
  • [39] Probabilistic Analytical Model for Settlement Risk Assessment of High-Speed Railway Subgrade
    Chen, R. P.
    Jiang, P.
    Ye, X. W.
    Bian, X. C.
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2016, 30 (03)
  • [40] Risk assessment for interaction effect of adjacent high-speed railway bridges and highways
    Department of Bridge Engineering, Tongji University, Shanghai, China
    IABSE Conf., Geneva: Struct. Eng.: Provid. Solutions Glob. Challenges - Rep., 1600, (878-885):