Analysing on Characteristics of Lightning Shielding Failure of UHVAC Double Circuit Transmission Line Based on Leader Progression Method

被引:0
|
作者
Wang, Zhiyong [1 ]
Wang, Shaoan [2 ]
Yu, Zhanqing [2 ]
Geng, Yinan [2 ]
Zeng, Rong [2 ]
He, Jinliang [2 ]
Li, Zhizhao [2 ]
机构
[1] China Southern Power Grid Co LTD, Guangzhou Power Supply Bur, Guangzhou 510620, Guangdong, Peoples R China
[2] Tsinghua Univ, State Key Lab Control & Simulat Power Syst & Gene, Dept Elect Engn, Beijing 100084, Peoples R China
关键词
STROKES; GAPS;
D O I
10.1109/APEMC.2010.5475688
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Shielding failure of lightning is the key problem for safe operation of UHV transmission lines. Taking the feature of 1000KV AC double circuit transmission lines into account, the leader progression method with proper criterion was employed. The lightning shielding failure rate of top phase, middle phase and bottom phase of two different transmission line tower types were compute, in three different geography conditions. The research work is helpful for improving the lightning performance of UHV transmission lines.
引用
收藏
页码:1582 / 1585
页数:4
相关论文
共 50 条
  • [21] Research On the electromechanical characteristics of the lightning rod which is used for taking precautions against transmission line shielding failure
    Zhao Jianning
    Zhou Wenjun
    Lei Xiaoyan
    Wang Xiaofeng
    Liu Yan
    2009 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), VOLS 1-7, 2009, : 4041 - +
  • [22] Numeral Analysis on Lightning Shielding Performance of Overhead Lines based on Leader Progression Model
    Hu, Jing
    Wen, Xishan
    Lan, Lei
    Sun, Jiantao
    Wang, Yu
    2009 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), VOLS 1-7, 2009, : 3531 - 3534
  • [23] Application technique of lightning rod for lightning shielding failure prevention of overhead electric power transmission line
    State Grid Construction DC Company Limited, Beijing 100005, China
    Gaodianya Jishu/High Voltage Engineering, 2008, 34 (06): : 1301 - 1305
  • [24] Multi-source Data Fusion Visualization Method for Transmission Line Lightning Shielding Failure Risk Evaluation
    Du Y.
    Huang L.
    Shen X.
    Xin W.
    Jin Z.
    Weng Y.
    Gaodianya Jishu/High Voltage Engineering, 2024, 50 (05): : 1877 - 1888
  • [25] The Calculation Model of the Shielding Failure Trip-out Rate of Double-circuit Transmission Line on the Same Tower
    Gao, Guangde
    Wang, Haifei
    Huang, Lintan
    Zhao, Shaofeng
    2012 POWER ENGINEERING AND AUTOMATION CONFERENCE (PEAM), 2012, : 272 - 276
  • [26] Leader progression analysis model for shielding failure computation by using the charge simulation method
    Vahid, Behrooz
    Yahyaabadi, Mostafa
    Tavakoli, Mohammad Reza Bank
    Ahadi, S. M.
    IEEE TRANSACTIONS ON POWER DELIVERY, 2008, 23 (04) : 2201 - 2206
  • [28] Fail ure of 220 kV double circuit transmission line tower due to lightning
    Nair, Z
    Aparna, KM
    Khandagale, RS
    Gopalan, TV
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2005, 19 (02) : 132 - 137
  • [29] Lightning overvoltages in electrical substation 220 kv due to shielding failure of overhead transmission line
    Vasileva, Margreta
    Stanchev, Danail
    2018 10TH ELECTRICAL ENGINEERING FACULTY CONFERENCE (BULEF), 2018,
  • [30] Identification method of shielding failure and back striking for overhead transmission line
    Du, Lin
    Chen, Huan
    Chen, Shaoqing
    Luo, Tao
    Li, Jianming
    Gaodianya Jishu/High Voltage Engineering, 2014, 40 (09): : 2885 - 2893