共 50 条
- [1] SIMULATION-BASED OPTIMIZATION FOR GROUPS OF CLUSTER TOOLS IN SEMICONDUCTOR MANUFACTURING USING SIMULATED ANNEALING PROCEEDINGS OF THE 2011 WINTER SIMULATION CONFERENCE (WSC), 2011, : 1852 - 1863
- [2] Simulation Analysis of Parallel Cluster tools in Semiconductor Manufacturing DIGITAL MANUFACTURING & AUTOMATION III, PTS 1 AND 2, 2012, 190-191 : 173 - 176
- [4] A Simulation-Based Approach for Operational Management of Time Constraint Tunnels in Semiconductor Manufacturing 2022 33RD ANNUAL SEMI ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE (ASMC), 2022,
- [5] Flexible manufacturing/cluster tools for semiconductor manufacturing SEMICONDUCTOR CHARACTERIZATION: PRESENT STATUS AND FUTURE NEEDS, 1996, : 46 - 51
- [6] Simulation-based assessment of batching heuristics in semiconductor manufacturing PROCEEDINGS OF THE 2003 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2003, : 1338 - 1345
- [7] Simulation-based advanced WIP management and control in semiconductor manufacturing PROCEEDINGS OF THE 2004 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2004, : 1943 - 1950
- [8] PARALLEL SIMULATION-BASED OPTIMIZATION ON SCHEDULING OF A SEMICONDUCTOR MANUFACTURING SYSTEM PROCEEDINGS OF THE 2014 WINTER SIMULATION CONFERENCE (WSC), 2014, : 2571 - 2579
- [9] Simulation-Based 'Smart' Operation Management System for Semiconductor Manufacturing ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: INNOVATIVE PRODUCTION MANAGEMENT TOWARDS SUSTAINABLE GROWTH (AMPS 2015), PT II, 2015, 460 : 82 - 89
- [10] SIMULATION-BASED PERFORMANCE ASSESSMENT OF AN IMPLANT SCHEDULER IN SEMICONDUCTOR MANUFACTURING 2017 WINTER SIMULATION CONFERENCE (WSC), 2017, : 3704 - 3713