Risk Control and Implementation Planning in IS Project

被引:0
|
作者
Zhang, Jian [1 ]
Jia, Suling [1 ]
Liu, Wenting [1 ]
Wang, Qiang [1 ]
机构
[1] Beijing Univ Aeronaut & Astronaut, Sch Econ & Management, Beijing 100083, Peoples R China
关键词
risk control; project planning; dynamic programming; integer programming;
D O I
10.1109/IEEM.2008.4738023
中图分类号
F [经济];
学科分类号
02 ;
摘要
The cost and benefit of information system project are uncertain which brings high risk. Therefore, in order to carry out project planning under the pre-condition of controlling risk, it is important to identify the risk features of IS project. As a first step towards that goal, this article discusses the stochastic variations of cost and benefit of IS project and elaborates the mathematical description of them. Additionally, the risk-control model of IS project under uncertainty is built by applying dynamic programming. Finally, a project planning method considering appropriate risk-control with the time and cost limitation is proposed using integer programming method, whose feasibility and efficiency are validated by case study.
引用
收藏
页码:1013 / 1017
页数:5
相关论文
共 50 条