Territory-Based Vehicle Routing in the Presence of Time-Window Constraints

被引:28
|
作者
Schneider, Michael [1 ]
Stenger, Andreas [2 ]
Schwahn, Fabian [1 ]
Vigo, Daniele [3 ]
机构
[1] Tech Univ Darmstadt, Logist Planning & Informat Syst, D-64289 Darmstadt, Germany
[2] Lufthansa, D-22335 Hamburg, Germany
[3] Univ Bologna, Dipartimento Ingn Energia Elettr & Informaz, I-40136 Bologna, Italy
关键词
routing consistency; service territories; small package shipping; vehicle routing problem; time windows; tabu search; SEARCH ALGORITHM; TABU SEARCH; DELIVERY; SYSTEMS; DESIGN;
D O I
10.1287/trsc.2014.0539
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Territory-based routing approaches (TBRAs) are commonly used to achieve high service consistency, e.g., in the small package shipping industry, but their drawback is a decline in routing flexibility. Consequently, a high percentage of time-definite deliveries, as common in the small package shipping sector, should have a significant negative effect on the solution quality of TBRAs. To the best of our knowledge, no study exists on the magnitude of this effect and the factors that influence it. Therefore, we develop a two-phase TBRA and use it (i) to investigate the design requirements of a TBRA for successfully handling time windows, and (ii) to study the influence of time window constraints on the performance of such an approach. We find that the consideration of geographical aspects in the districting is paramount for generating high-quality territories, whereas explicitly incorporating time window characteristics and historical demand data does not lead to a perceptible improvement of the solution quality. Moreover, the efficiency and feasibility forfeits of our TBRA in comparison to daily route reoptimization (RR) are larger if time windows are present. However, significantly higher consistency improvements compared to RR are achieved for time-constrained problems. This is due to the fact that RR solutions to time-definite problems exhibit lower consistency and thus a higher potential for improvement by using a TBRA, which constitutes an important insight for practitioners.
引用
收藏
页码:732 / 751
页数:20
相关论文
共 50 条
  • [21] Planning approximations to the average length of vehicle routing problems with time window constraints
    Figliozzi, Miguel Andres
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2009, 43 (04) : 438 - 447
  • [22] Genetic algorithm for a vehicle routing problem with pickup & delivery with time window constraints
    Perez, Jesus Fabian Lopez
    ICIL 2005: Proceedings of the International Conference on Industrial Logistics, 2005, : 173 - 181
  • [23] Hybrid Meta-Heuristics for Vehicle Routing Problem with Time Window Constraints
    Chen, James C.
    Hsieh, W. H.
    Cheng, C. H.
    Chen, C. S.
    2009 6TH INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT, VOLS 1 AND 2, 2009, : 369 - +
  • [24] The Optimization of Transportation Costs in Logistics Enterprises with Time-Window Constraints
    Yan, Qingyou
    Zhang, Qian
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2015, 2015
  • [25] Artificial intelligence heuristics in solving vehicle routing problems with time window constraints
    Tan, KC
    Lee, LH
    Ou, K
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2001, 14 (06) : 825 - 837
  • [26] Hybrid Genetic Algorithms in solving Vehicle Routing Problems with Time Window Constraints
    Tan, KC
    Lee, LH
    Ou, K
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2001, 18 (01) : 121 - 130
  • [27] A relative robust optimization for a vehicle routing problem with time-window and synchronized visits considering greenhouse gas emissions
    Shi, Yong
    Zhou, Yanjie
    Ye, Wenhui
    Zhao, Qian Qian
    JOURNAL OF CLEANER PRODUCTION, 2020, 275 (275)
  • [28] THE OPTIMAL SCHEDULING MODEL FOR AGRICULTURAL MACHINERY RESOURCES WITH TIME-WINDOW CONSTRAINTS
    Luo, X. W.
    Zhang, L. Y.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2016, 15 (04) : 721 - 731
  • [29] Recent progress of local search in handling the time window constraints of the vehicle routing problem
    Hideki Hashimoto
    Mutsunori Yagiura
    Shinji Imahori
    Toshihide Ibaraki
    Annals of Operations Research, 2013, 204 : 171 - 187
  • [30] Multiobjective vehicle routing and scheduling problem with time window constraints in hazardous material transportation
    Meng, Q
    Lee, DH
    Cheu, RL
    JOURNAL OF TRANSPORTATION ENGINEERING, 2005, 131 (09) : 699 - 707