Simulation-based-optimization to solve a multiobjective hybrid flowshop scheduling problem

被引:0
|
作者
Li, Xiaohui [1 ]
Chehade, Hicham [1 ]
Yalaoui, Farouk [1 ]
Amodeo, Lionel [1 ]
机构
[1] Univ Technol Troyes, Inst Charles Delaunay, Lab Optimisat Syst Ind, 12 Rue Marie Curie,BP2060, F-10000 Troyes, France
关键词
Hybrid Flowshop; Multiobjective optimization; NSG A-II; Simulation; ARENA; Assembly line;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper deals with a multiobjective hybrid flowshop scheduling optimization problem. Due to the difficulty to develop a mathematical model of the studied problem in order to solve it with an analytical approach, an efficient simulation with ARENA is applied to model the considered flowshop. We have proposed a special pre-emption structure to ensure that the job sequence in each machine corresponds to the solution encoding of the resolution method. The latter is a well known multiobjective genetic algorithm NSGA-II which is applied to optimize the makespan and the total tardiness of the production. The results of the NSG A-II algorithm are compared with industrial solutions and an exact method for small size problems to prove the efficiency and the feasibility of the proposed algorithm.
引用
收藏
页码:174 / 183
页数:10
相关论文
共 50 条
  • [41] Preemptive Hybrid Flowshop Scheduling problem of interval orders
    Djellab, H
    Djellab, K
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2002, 137 (01) : 37 - 49
  • [42] Dynamic hybrid flowshop scheduling problem with multiprocessor tasks
    Xuan, Hua
    Tang, Li-Xin
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2007, 13 (11): : 2254 - 2260
  • [43] A Weight-Based Multiobjective Genetic Algorithm For Flowshop Scheduling
    Fang, Zhimin
    2009 INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND COMPUTATIONAL INTELLIGENCE, VOL I, PROCEEDINGS, 2009, : 373 - 377
  • [44] SIMULATION-BASED OPTIMIZATION FOR SOLVING A HYBRID FLOW SHOP SCHEDULING PROBLEM
    Aurich, Paul
    Nahhas, Abdulrahman
    Reggelin, Tobias
    Tolujew, Juri
    2016 WINTER SIMULATION CONFERENCE (WSC), 2016, : 2809 - 2819
  • [45] A multiobjective hybrid ant colony optimization approach applied to the assignment and scheduling problem
    Dridi, Olfa
    Krichen, Saoussen
    Guitouni, Adel
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2014, 21 (06) : 935 - 953
  • [46] Reentrant hybrid flowshop scheduling problem based on total weighted completion time
    Xuan H.
    Li B.
    Luo S.-M.
    Wang X.-Y.
    Kongzhi yu Juece/Control and Decision, 2018, 33 (12): : 2218 - 2226
  • [47] A hybrid genetic algorithm for optimization problems in flowshop scheduling
    Wu Jingjing
    Xu Kelin
    Kong Qinghua
    Jiang Wenxian
    PROCEEDINGS OF THE 14TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS A AND B: BUILDING CORE COMPETENCIES THROUGH IE&EM, 2007, : 38 - 43
  • [48] Fuzzy Logic Controller Based Multiobjective Metaheuristics to Solve a Parallel Machines Scheduling Problem
    Li, Xiaohui
    Chehade, Hicham
    Yalaoui, Farouk
    Amodeo, Lionel
    JOURNAL OF MULTIPLE-VALUED LOGIC AND SOFT COMPUTING, 2012, 18 (5-6) : 617 - 636
  • [49] A hybrid genetic algorithm for distributed hybrid blocking flowshop scheduling problem
    Sun, Xueyan
    Shen, Weiming
    Vogel-Heuser, Birgit
    JOURNAL OF MANUFACTURING SYSTEMS, 2023, 71 : 390 - 405
  • [50] Hybrid Memetic Algorithm to Solve Multiobjective Distributed Fuzzy Flexible Job Shop Scheduling Problem with Transfer
    Yang, Jinfeng
    Xu, Hua
    PROCESSES, 2022, 10 (08)