Simulation-based-optimization to solve a multiobjective hybrid flowshop scheduling problem

被引:0
|
作者
Li, Xiaohui [1 ]
Chehade, Hicham [1 ]
Yalaoui, Farouk [1 ]
Amodeo, Lionel [1 ]
机构
[1] Univ Technol Troyes, Inst Charles Delaunay, Lab Optimisat Syst Ind, 12 Rue Marie Curie,BP2060, F-10000 Troyes, France
关键词
Hybrid Flowshop; Multiobjective optimization; NSG A-II; Simulation; ARENA; Assembly line;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper deals with a multiobjective hybrid flowshop scheduling optimization problem. Due to the difficulty to develop a mathematical model of the studied problem in order to solve it with an analytical approach, an efficient simulation with ARENA is applied to model the considered flowshop. We have proposed a special pre-emption structure to ensure that the job sequence in each machine corresponds to the solution encoding of the resolution method. The latter is a well known multiobjective genetic algorithm NSGA-II which is applied to optimize the makespan and the total tardiness of the production. The results of the NSG A-II algorithm are compared with industrial solutions and an exact method for small size problems to prove the efficiency and the feasibility of the proposed algorithm.
引用
收藏
页码:174 / 183
页数:10
相关论文
共 50 条
  • [1] A new method coupling simulation and a hybrid metaheuristic to solve a multiobjective hybrid flowshop scheduling problem
    Li, Xiaohui
    Chehade, Hicham
    Yalaoui, Farouk
    Amodeo, Lionel
    PROCEEDINGS OF THE 7TH CONFERENCE OF THE EUROPEAN SOCIETY FOR FUZZY LOGIC AND TECHNOLOGY (EUSFLAT-2011) AND LFA-2011, 2011, : 1082 - 1089
  • [2] An Insertion Procedure to Solve Hybrid Multiobjective Permutation Flowshop Scheduling Problems
    Motair, Hafed M.
    INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2020, 19 (04): : 803 - 811
  • [3] A multiobjective evolutionary algorithm based on decomposition for hybrid flowshop green scheduling problem
    Zhang, Biao
    Pan, Quan-ke
    Gao, Liang
    Li, Xin-yu
    Meng, Lei-lei
    Peng, Kun-kun
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 136 : 325 - 344
  • [4] A Multiobjective Optimization Approach for Multiobjective Hybrid Flowshop Green Scheduling with Consistent Sublots
    Wang, Weiwei
    Zhang, Biao
    Jia, Baoxian
    SUSTAINABILITY, 2023, 15 (03)
  • [5] Multiobjective scheduling of a reentrant hybrid flowshop
    Dugardin, Frederic
    Amodeo, Lionel
    Yalaoui, Farouk
    CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 193 - 198
  • [6] Improved Migrating Birds Optimization Algorithm to Solve Hybrid Flowshop Scheduling Problem With Lot-Streaming
    Wang, Ping
    Sang, Hongyan
    Tao, Qiuyun
    Guo, Hengwei
    Li, Junqing
    Gao, Kaizhou
    Han, Yuyan
    IEEE ACCESS, 2020, 8 : 89782 - 89792
  • [7] Hybrid Taguchi-Based Particle Swarm Optimization for Flowshop Scheduling Problem
    Yang, Ching-I
    Chou, Jyh-Horng
    Chang, Ching-Kao
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2014, 39 (03) : 2393 - 2412
  • [8] A hybrid discrete biogeography-based optimization for the permutation flowshop scheduling problem
    Lin, Jian
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (16) : 4805 - 4814
  • [9] Hybrid Taguchi-Based Particle Swarm Optimization for Flowshop Scheduling Problem
    Ching-I Yang
    Jyh-Horng Chou
    Ching-Kao Chang
    Arabian Journal for Science and Engineering, 2014, 39 : 2393 - 2412
  • [10] On the hybrid flowshop scheduling problem
    Haouari, Mohamed
    Hidri, Lotfi
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 113 (01) : 495 - 497