True triaxial testing of geogrid for high speed railways

被引:39
|
作者
Yu, Z. [1 ]
Woodward, P. K. [2 ]
Laghrouche, O. [1 ]
Connolly, D. P. [2 ]
机构
[1] Heriot Watt Univ, Inst Infrastruct & Environm, Edinburgh, Midlothian, Scotland
[2] Univ Leeds, Inst High Speed Rail & Syst Integrat, Leeds LS2 9JT, W Yorkshire, England
关键词
True triaxial testing rig; Geogrid confinement; Ballasted high speed railway; Railroad track settlement; Cyclic laboratory loading; Subballast-subgrade geogrid; REINFORCED BALLAST; BEHAVIOR; DEFORMATION;
D O I
10.1016/j.trgeo.2019.100247
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This work describes a series of novel experimental tests to determine the potential of geogrids to confine granular layers within ballasted railway lines operating at speeds close to critical velocity. This is important because at low train speeds, vertical stresses are dominant, but when approaching critical velocity conditions, dynamic horizontal stress levels are magnified. Therefore the majority of previous geogrid investigations have been performed assuming constant horizontal stress levels, thus making them more relevant for lower speed lines. To investigate settlement under high relative train speeds, ballasted railway track samples were subject to combined vertical-horizontal cyclic loading. Three areas were explored: (1) the performance benefit from placing geogrid at the ballast-subballast interface, (2) the performance benefit from placing geogrid at the subballast-subgrade interface, (3) the effect of subgrade stiffness on geogrid performance at the subballast-subgrade interface. Testing was performed using a unique large-scale true triaxial apparatus which had the ability to vary stress levels in three Cartesian directions. Compared to the control conditions, the geogrid offered a settlement improvement of approximately 35% when placed at the ballast-subballast interface, and 10-15% when placed at the subballast-subgrade interface. Regarding subgrade CBR, it was found that the geogrid offered the greatest performance benefits when the subgrade was soft. Therefore it was concluded that for the ballasted rail structures under test, when subject to elevated levels of horizontal stress, geogrids reduced settlements compared to non-geogrid solutions.
引用
收藏
页数:9
相关论文
共 50 条
  • [21] Design of Railway Track for Speed and High-speed Railways
    Hodas, Stanislav
    XXIII R-S-P SEMINAR, THEORETICAL FOUNDATION OF CIVIL ENGINEERING (23RSP) (TFOCE 2014), 2014, 91 : 256 - 261
  • [22] High speed train for Italian State Railways
    Pecorini, M.
    Rail International, 1989, 20 (01): : 79 - 89
  • [23] ECONOMIC HIGH-SPEED RUNNING OF RAILWAYS
    JONES, S
    ELECTRONICS AND POWER, 1975, 21 (02): : 100 - 104
  • [24] Gear systems for high-speed railways
    Ono, Hiroshi
    Toraibarojisuto/Journal of Japanese Society of Tribologists, 2013, 58 (07): : 473 - 478
  • [25] Brake systems for high-speed railways
    Kumabe, Ken-Ichi
    Toraibarojisuto/Journal of Japanese Society of Tribologists, 2013, 58 (07): : 462 - 466
  • [26] Geotechnical aspects for high-speed railways
    Brandl, H
    Geotechnics in Pavement and Railway Design and Construction, 2004, : 117 - 132
  • [27] FUTURE PROSPECTS OF HIGH SPEED RAILWAYS.
    Takahashi, Koji
    Civil engineering in Japan, 1984, 23 : 1 - 14
  • [28] High-speed railways and collaborative innovation
    Hanley, Douglas
    Li, Jiancheng
    Wu, Mingqin
    REGIONAL SCIENCE AND URBAN ECONOMICS, 2022, 93
  • [29] Exploring of Chinese High-Speed Railways
    Liu Youmei (Zhuzhou Electric Locomotive works
    Engineering Sciences, 2004, (01) : 7 - 14
  • [30] Internet of things for high-speed railways
    Zhong G.
    Xiong K.
    Zhong Z.
    Ai B.
    Intelligent and Converged Networks, 2021, 2 (02): : 115 - 132