共 50 条
- [33] Scheduling Jobs on a Flexible Machine to Minimize Overtime and Weighted Tardiness Costs PROCEEDINGS OF INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM'2011): INNOVATIVE APPROACHES AND TECHNOLOGIES FOR NETWORKED MANUFACTURING ENTERPRISES MANAGEMENT, 2011, : 121 - 125
- [40] Scheduling Stochastic jobs on a repairable machine with general phase type uptime Mathematical Methods of Operations Research, 2005, 61 : 399 - 417