Enhancing the quality of bid evaluation in government refurbishment projects

被引:3
|
作者
Alwis, G. C. D. [1 ]
Perera, B. A. K. S. [2 ]
Gallage, S. D. [2 ]
Indikatiya, I. H. P. R. [2 ]
机构
[1] Univ Vocat Technol, Dept Quant Surveying, Dehiwala Mount Lavinia, Sri Lanka
[2] Univ Moratuwa, Dept Bldg Econ, Moratuwa, Sri Lanka
关键词
Refurbishment projects; bid evaluation; government tender procedure; CONTRACTOR SELECTION; CONSTRUCTION; DECISION; PROCUREMENT; COMPETITIVENESS; SUSTAINABILITY; CHALLENGES; SYSTEM;
D O I
10.1080/17508975.2020.1753639
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In government refurbishment projects, contractors are selected through competitive bidding. The special characteristics of these projects, such as complexity, uncertainty, lack of design details and unclear scope, and the accountability expected from them, make it necessary to have in place a proper procedure for evaluating the bids received for these projects. Some of the major problems encountered when evaluating these projects are the small number of bids received, wide differences noticed among the submissions and the difficulties experienced in the assessment of the impact of non-price factors of the bidders. The adjustment of the weightages given to project requirements; and the determination of the actual capabilities and the impact of the non-price factors of the bidders would improve the quality of the bids, the efficiency of the overall bid evaluation procedure; and the success of the projects.
引用
收藏
页码:375 / 390
页数:16
相关论文
共 50 条
  • [31] Research On Invite Bid Models Of Public Projects Invested By Government Based On Principal-Agent Theory
    Wang Lin-xiu
    Xie-lei
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL II, 2008, : 443 - +
  • [32] Research on performance evaluation model of government investment projects
    Zhang, Hui
    BASIC & CLINICAL PHARMACOLOGY & TOXICOLOGY, 2018, 124 : 102 - 103
  • [33] Ion beam analysis of gas turbine blades: evaluation of refurbishment quality
    O KAKUEE
    V FATHOLLAHI
    P OLIAIY
    D AGHA-ALIGOL
    M LAMEHI-RACHTI
    Bulletin of Materials Science, 2015, 38 : 511 - 516
  • [34] Information required in managing the design process of refurbishment projects
    Ali, A. S.
    Kamaruzzaman, S. N.
    Abdul-Samad, Z.
    STRUCTURAL STUDIES, REPAIRS AND MAINTENANCE OF HERITAGE ARCHITECTURE XI, 2009, 109 : 407 - 415
  • [35] Research on bid evaluation model for engineering projects based on VE-AHP-FCE
    Zhang, Yi
    Energy Education Science and Technology Part A: Energy Science and Research, 2014, 32 (06): : 5883 - 5892
  • [36] Research on dynamic analysis of influencing factors of electronic decentralized bid evaluation for engineering projects
    Zhu, Wenxi
    Guo, Yabin
    Chen, Yun
    Journal of Railway Science and Engineering, 2021, 18 (06) : 1631 - 1639
  • [37] ENHANCING THE QUALITY OF PRODUCTS AND PROJECTS THROUGH BETTER DESIGNS AND MODELING
    Suwartha, Nyoman
    Berawi, Mohammed Ali
    Zagloel, T. Yuri M.
    Surjandari, Isti
    INTERNATIONAL JOURNAL OF TECHNOLOGY, 2015, 6 (05) : 718 - 721
  • [38] Enhancing Environmental Quality of Cities Using Landscape Transformation Projects
    Guneroglu, Nilgun
    Bekar, Makbulenur
    POLISH JOURNAL OF ENVIRONMENTAL STUDIES, 2019, 28 (06): : 4171 - 4181
  • [39] Evaluation of a refurbishment scheme incorporating the King's Fund "Enhancing the Healing Environment" design principles
    Payne, Helen
    May, Daryl
    JOURNAL OF FACILITIES MANAGEMENT, 2009, 7 (01) : 74 - +
  • [40] A sustainability evaluation of government-led urban renewal projects
    Lee, Grace
    Chan, Edwin
    FACILITIES, 2008, 26 (13-14) : 526 - 541