The estimation of potential hazardous operations of the stilling basin can be obtained after determining their critical regimes. The processes definition can be understood from the power point of view with a relative ease. At times, however, there is the possibility to observe several critical regimes for varying discharges. These regimes govern the design defining the dimensions of the stilling basin. The stilling basin of Chaira Dam Bulgaria is a good example demonstrating these different governing regimes. Several unfavourable effects are observed at different working regimes. This authors' work shows that predictions of the negative effects at the stilling basins is possible and necessary. This paper describes how the current Chaira Dam construction allows a unique possibility to observe and document extreme regimes for discharges less than the maximum level possible. These regimes, obtained for both small and large openings of the gate, are explored and explained in detail.
引用
收藏
页码:661 / 667
页数:7
相关论文
共 50 条
  • [41] Risk assessment of gravity dam with machine properties
    Li, FenHua
    Ma, Hui
    RESEARCH ON MECHANICAL ENGINEERING, CIVIL ENGINEERING AND MATERIAL ENGINEERING, 2014, 454 : 43 - 47
  • [42] Study on the Risk Assessment of the Tailings Dam Break
    Zheng Xin
    Xu Xiaohu
    Xu Kaili
    ISMSSE 2011, 2011, 26
  • [43] Risk assessment approach to dam safety criteria
    Bowles, DS
    Anderson, LR
    Glover, TF
    UNCERTAINTY IN THE GEOLOGIC ENVIRONMENT: FROM THEORY TO PRACTICE, VOLS 1 AND 2: PROCEEDINGS OF UNCERTAINTY '96, 1996, (58): : 451 - 473
  • [44] A role for risk assessment in dam safety management
    Bowles, DS
    Anderson, LR
    Glover, TF
    HYDROPOWER '97, 1997, : 359 - 367
  • [45] Portfolio risk assessment: A tool for dam safety risk management
    Bowles, DS
    Anderson, LR
    Glover, TF
    Chauhan, SS
    MANAGING THE RISKS OF DAM PROJECT DEVELOPMENT, SAFETY AND OPERATION, 1998, : 317 - 334
  • [46] Assessment of Potential Dam Sites in the Kabul River Basin Using GIS
    Rasooli, Ahmadullah
    Kang, Dongshik
    INTERNATIONAL JOURNAL OF ADVANCED COMPUTER SCIENCE AND APPLICATIONS, 2015, 6 (02) : 83 - 89
  • [47] Quantitative assessment of flood risk with evaluation of the effectiveness of dam operation for flood control: A case of the Bago River Basin of Myanmar
    Shrestha, Badri Bhakta
    Kawasaki, Akiyuki
    INTERNATIONAL JOURNAL OF DISASTER RISK REDUCTION, 2020, 50
  • [48] Research on the Grey Assessment System of Dam Failure Risk
    Jiang Ying
    Zhang QiuWen
    JOURNAL OF COMPUTERS, 2012, 7 (09) : 2334 - 2341
  • [49] Risk assessment strategies for dam based hydro schemes
    Sandilands, NM
    Noble, M
    Findlay, JW
    PROSPECT FOR RESERVOIRS IN THE 21ST CENTURY, 1998, : 13 - 26
  • [50] Dam overtopping risk assessment considering inspection program
    Kuo, Jan-Tai
    Hsu, Yung-Chia
    Tung, Yeou-Koung
    Yeh, Keh-Chia
    Wu, Jian-De
    STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2008, 22 (03) : 303 - 313