A branch-and-bound algorithm for minimising the number of tardy jobs in a two-machine flow-shop problem with release dates

被引:10
|
作者
Ardakan, Mostafa Abouei [1 ]
Hakimian, Ali [1 ]
Rezvan, Mohammad Taghi [1 ]
机构
[1] Isfahan Univ Technol, Dept Ind & Syst Engn, Esfahan, Iran
关键词
number of tardy jobs; release dates; flow shop; branch-and-bound; scheduling; SINGLE-MACHINE; WEIGHTED NUMBER; SHOP PROBLEM;
D O I
10.1080/0951192X.2013.820349
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This article considers the two-machine flow-shop scheduling problem with the objective of minimising the number of tardy jobs in which jobs have release dates. Since the problem under consideration is an NP-hard problem, a branch-and-bound (B&B) algorithm is viable to solve the problem exactly. A heuristic algorithm as an upper bound, some lower bounds and several efficient dominance properties are used to speed up the elimination process of the B&B algorithm. For the evaluation of the performance of the proposed algorithm, computational experiments are performed on test problems and results are displayed. The experimental results show that the proposed B&B algorithm can solve problems with up to 28 jobs in timely manner, and the average percentage gap of the heuristic solutions is about 10%.
引用
收藏
页码:519 / 528
页数:10