Lead-time planning in stochastic production system: An approach using perturbation analysis

被引:0
|
作者
Feng, Ding-zhong [1 ]
Jiang, Mei-xian [1 ]
Chen, Lei-lei [1 ]
机构
[1] Zhejiang Univ Technol, Coll Mechatron Engn, Hangzhou 310032, Peoples R China
关键词
production system; lead-time planning; stochastic optimization; perturbation analysis;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Determining appropriate production lead-time is an important and complex issue in production planning and control for a stochastic production system. The problem of interest in this paper is to rind optimal lead-time for a serial production system operating on a make-to-order basis, in which the actual procurement and processing times are stochastic. We formulate this problem as an unconstrained minimization problem by minimizing the expected sum of the work-in-process holding cost and product tardiness cost. A stochastic optimization algorithm for a two-stage stochastic production system is proposed to optimize stage lead-times. In the optimization algorithm, perturbation analysis is used to derive the gradient estimate of the cost function with respect to stage lead-times. We prove that the gradient estimate is unbiased, and thus ensure that the estimate is accurate when it is used to solve the problem. Also, a numerical example is given to show the performance of the proposed algorithm.
引用
收藏
页码:1134 / 1138
页数:5
相关论文
共 50 条
  • [21] Multi-Objective Lead-Time Control Problem with Stochastic Constraints
    Molavi, M.
    Hamzeli, H.
    Dalfard, V. M.
    JOURNAL OF APPLIED RESEARCH AND TECHNOLOGY, 2014, 12 (05) : 927 - 938
  • [22] OPTIMAL CONTROL OF PRODUCTION PROCESSES THAT INCLUDE LEAD-TIME DELAYS
    Shirai, Kenji
    Amano, Yoshinori
    INTERNATIONAL JOURNAL OF INNOVATIVE COMPUTING INFORMATION AND CONTROL, 2019, 15 (01): : 21 - 37
  • [23] RISK-SENSITIVE PRODUCTION PLANNING OF STOCHASTIC MANUFACTURING SYSTEMS - A SINGULAR PERTURBATION APPROACH
    ZHANG, Q
    SIAM JOURNAL ON CONTROL AND OPTIMIZATION, 1995, 33 (02) : 498 - 527
  • [24] Lead-time approach to ISO 9000:2000 series standards
    Anon
    Standarty i Kachestvo, 2001, (02): : 44 - 46
  • [25] Reducing Order and Inventory Variability under Stochastic Lead-time and Correlated Demand
    Wang, Xun
    Disney, Stephen M.
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), 2015, : 312 - 321
  • [26] A stochastic inventory model of dual sourced supply chain with lead-time reduction
    Ryu, SW
    Lee, KK
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2003, 81-2 : 513 - 524
  • [27] Lead-Time Stability Control for Nonlinear Continuous and Disturbed System
    Lin, Qiong
    Zhou, Ying-Jiang
    Jiang, Guo-Ping
    2020 CHINESE AUTOMATION CONGRESS (CAC 2020), 2020, : 5413 - 5418
  • [28] An integrated vendor–buyer cooperative model under stochastic supply lead-time
    Mohsen Sheikh Sajadieh
    Mohammad Reza Akbari Jokar
    The International Journal of Advanced Manufacturing Technology, 2009, 41 : 1043 - 1050
  • [29] Conditional Lead-Time Flexibility in an Assemble-to-Order System
    Yu, Yi
    Deng, Tianhu
    Song, Jing-Sheng
    M&SOM-MANUFACTURING & SERVICE OPERATIONS MANAGEMENT, 2024, : 2194 - 2211
  • [30] Investing in lead-time variability reduction in a collaborative vendor-buyer supply chain model with stochastic lead time
    Lin, Hsien-Jen
    COMPUTERS & OPERATIONS RESEARCH, 2016, 72 : 43 - 49