PROBLEM SOLVING CONSTRAINTS AND EXECUTION TIME EXPECTATION ON GRIDS

被引:0
|
作者
Chen, Uei-Ren [1 ,2 ]
Chen, Jyun-Ming [1 ]
Lin, Woei [1 ]
机构
[1] Natl Chung Hsing Univ, Dept Comp Sci, Taichung 41280, Taiwan
[2] Hsiuping Inst Technol, Dept Elect Engn, Taichung 41280, Taiwan
关键词
Execution time expectation; grid resource model;
D O I
10.1080/02533839.2008.9671470
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Execution time expectation is a Useful method to evaluate the efficiency of selected computational resources for a given problem. It can assist us to judge the fitness of selected resources for a given problem, and can tell us whether a problem-solving method is Suitable for these grid computational resources. However, it is not easy to have a good computing time expectation in a realistic grid environment. In this Study. a fundamental grid system model and problem solving methodology have been established to analyze this issue. Several constraints for problem solving oil it proposed grid resource model have been developed for this purpose. Experiments on a grid system. the Taiwan UniGrid, were performed to verify the effectiveness of these measures. Performance comparison of computation-intensive and communication-intensive problems can provide some valuable practical experience oil the use of execution time expectation.
引用
收藏
页码:1151 / 1163
页数:13
相关论文
共 50 条
  • [41] Solving the hydrothermal scheduling problem considering network constraints
    Takigawa, Fabricio Y. K.
    da Silva, Edson L.
    Finardi, Erlon C.
    Rodrigues, Rafael N.
    ELECTRIC POWER SYSTEMS RESEARCH, 2012, 88 : 89 - 97
  • [42] Solving the Team Orienteering Problem with Fuzzy Scores and Constraints
    Brito, Julio
    Exposito, Airam
    Moreno, Jose A.
    2016 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS (FUZZ-IEEE), 2016, : 1614 - 1620
  • [43] Cognitive constraints on computer problem-solving skills
    Sohn, YW
    Doane, SM
    JOURNAL OF EXPERIMENTAL PSYCHOLOGY-APPLIED, 1997, 3 (04) : 288 - 312
  • [44] Solving the project scheduling problem with dependent resource constraints
    Lin, Chun-Wei R.
    Lai, Yung Sheng
    Jeng, Shiou-Yun
    Hsiau, Hsian-Jong
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2025, 42 (01) : 30 - 46
  • [45] Implicit constraints: Heuristics applied to complex problem solving
    deVivies, X
    INTERNATIONAL JOURNAL OF PSYCHOLOGY, 1996, 31 (3-4) : 45411 - 45411
  • [46] CONSTRAINTS ON SPONTANEOUS TRANSFER IN PROBLEM-SOLVING TASKS
    STEIN, BS
    WAY, KR
    BENNINGFIELD, SE
    HEDGECOUGH, CA
    MEMORY & COGNITION, 1986, 14 (05) : 432 - 441
  • [47] Solving the Truck and Trailer Routing Problem with Fuzzy Constraints
    Torres, Isis
    Cruz, Carlos
    Verdegay, Jose L.
    INTERNATIONAL JOURNAL OF COMPUTATIONAL INTELLIGENCE SYSTEMS, 2015, 8 (04) : 713 - 724
  • [48] HPC application execution on Grids
    Danelutto, M
    Vanneschi, M
    Zoccolo, C
    Tonellotto, N
    Orlando, S
    Baraglia, R
    Fagni, T
    Laforenza, D
    Paccosi, A
    FUTURE GENERATION GRIDS, 2006, : 263 - +
  • [49] Solving the Truck and Trailer Routing Problem with Fuzzy Constraints
    Isis Torres
    Carlos Cruz
    José L. Verdegay
    International Journal of Computational Intelligence Systems, 2015, 8 : 713 - 724
  • [50] A framework for adaptive execution in grids
    Huedo, E
    Montero, RS
    Llorente, IM
    SOFTWARE-PRACTICE & EXPERIENCE, 2004, 34 (07): : 631 - 651