Single-machine resource allocation scheduling with due-date assignment, deterioration effect and position-dependent weights

被引:17
|
作者
Liu, Weiwei [1 ,2 ]
Yao, Yao [2 ]
Jiang, Chong [3 ]
机构
[1] Northeastern Univ, Sch Comp Sci & Engn, Shenyang, Liaoning, Peoples R China
[2] Shenyang Sport Univ, Sch Management & Journalism & Commun, Shenyang, Liaoning, Peoples R China
[3] Nanjing Sport Inst, Dept Sport & Hlth Sci, Nanjing, Jiangsu, Peoples R China
关键词
Scheduling; due-date assignment; deterioration effect; resource allocation; PROCESSING TIME JOBS;
D O I
10.1080/0305215X.2019.1608980
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This article considers scheduling problems with resource allocation, deterioration effect and position-dependent weights on a single machine. For two different due-date assignment methods-i.e. common (CON) due-date assignment and slack (SLK) due-date assignment-a bi-criteria analysis is provided wherein the first objective is to minimize the weighted sum of the absolute value in lateness with a common due date (a common flow-allowance), and the second objective is to minimize the weighted sum of resource consumption. Optimality properties and algorithms are proposed to solve three different versions of considering these two criteria.