Single-machine resource allocation scheduling with due-date assignment, deterioration effect and position-dependent weights

被引:17
|
作者
Liu, Weiwei [1 ,2 ]
Yao, Yao [2 ]
Jiang, Chong [3 ]
机构
[1] Northeastern Univ, Sch Comp Sci & Engn, Shenyang, Liaoning, Peoples R China
[2] Shenyang Sport Univ, Sch Management & Journalism & Commun, Shenyang, Liaoning, Peoples R China
[3] Nanjing Sport Inst, Dept Sport & Hlth Sci, Nanjing, Jiangsu, Peoples R China
关键词
Scheduling; due-date assignment; deterioration effect; resource allocation; PROCESSING TIME JOBS;
D O I
10.1080/0305215X.2019.1608980
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This article considers scheduling problems with resource allocation, deterioration effect and position-dependent weights on a single machine. For two different due-date assignment methods-i.e. common (CON) due-date assignment and slack (SLK) due-date assignment-a bi-criteria analysis is provided wherein the first objective is to minimize the weighted sum of the absolute value in lateness with a common due date (a common flow-allowance), and the second objective is to minimize the weighted sum of resource consumption. Optimality properties and algorithms are proposed to solve three different versions of considering these two criteria.
引用
收藏
页码:701 / 714
页数:14
相关论文
共 50 条
  • [1] A Bicriterion Approach to Due Date Assignment Scheduling in Single-Machine with Position-Dependent Weights
    Sun, Xinyu
    Geng, Xin-Na
    Wang, Jiayin
    Liu, Tao
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2023, 40 (02)
  • [2] Due date assignment single-machine scheduling with delivery times, position-dependent weights and deteriorating jobs
    Pan, Lei
    Sun, Xinyu
    Wang, Ji-Bo
    Zhang, Li-Han
    Lv, Dan-Yang
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2023, 45 (04)
  • [3] Due date assignment single-machine scheduling with delivery times, position-dependent weights and deteriorating jobs
    Lei Pan
    Xinyu Sun
    Ji-Bo Wang
    Li-Han Zhang
    Dan-Yang Lv
    Journal of Combinatorial Optimization, 2023, 45
  • [4] Study on proportionate flowshop scheduling with due-date assignment and position-dependent weights
    Dan-Yang Lv
    Ji-Bo Wang
    Optimization Letters, 2021, 15 : 2311 - 2319
  • [5] Study on proportionate flowshop scheduling with due-date assignment and position-dependent weights
    Lv, Dan-Yang
    Wang, Ji-Bo
    OPTIMIZATION LETTERS, 2021, 15 (06) : 2311 - 2319
  • [6] Flow Shop Resource Allocation Scheduling with Due Date Assignment, Learning Effect and Position-Dependent Weights
    Liu, Wei-Wei
    Jiang, Chong
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2020, 37 (03)
  • [7] SINGLE-MACHINE SCHEDULING AND DUE DATE ASSIGNMENT WITH REJECTION AND POSITION-DEPENDENT PROCESSING TIMES
    Zhao, Chuanli
    Yin, Yunqiang
    Cheng, T. C. E.
    Wu, Chin-Chia
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2014, 10 (03) : 691 - 700
  • [8] A note on study on proportionate flowshop scheduling with due-date assignment and position-dependent weights
    Jin Qian
    Guisong Chang
    Optimization Letters, 2022, 16 : 2645 - 2648
  • [9] A note on study on proportionate flowshop scheduling with due-date assignment and position-dependent weights
    Qian, Jin
    Chang, Guisong
    OPTIMIZATION LETTERS, 2022, 16 (09) : 2645 - 2648
  • [10] Study on Single-Machine Group Scheduling with Due-Window Assignment and Position-Dependent Weights
    Liu, Weiguo
    Wang, Xuyin
    Wang, Xiaoxiao
    Zhao, Peizhen
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021