共 50 条
- [27] MULTI-OBJECTIVE UNRELATED PARALLEL MACHINES SCHEDULING WITH SEQUENCE-DEPENDENT SETUP TIMES AND PRECEDENCE CONSTRAINTS INTERNATIONAL JOURNAL OF ENGINEERING, 2008, 21 (03): : 269 - 278
- [30] Scheduling jobs on dynamic parallel machines with sequence-dependent setup times The International Journal of Advanced Manufacturing Technology, 2010, 47 : 773 - 781