Research on Flow Shop Scheduling Problem with Multi-customer and Fuzzy Due Date Based on Non-cooperative Games

被引:0
|
作者
Zhou, Yanping [1 ]
Gu, Xingsheng [1 ]
机构
[1] E China Univ Sci & Technol, Res Inst Automat, Shanghai 200237, Peoples R China
关键词
non-cooperative games; FSSP with multi-customer and fuzzy due date; genetic algorithm; competitive strategy; nash equilibrium point;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
To satisfy lowest threshold of multi-customer satisfaction degree, this paper aims at maximizing customer comprehensive satisfaction degree, a type of flow shop scheduling problem (FSSP) with multi-customer and fuzzy due date is researched. Used theory of non-cooperative games, a sort of scheduling model based on non-cooperative games with complete information is put forward and established, in this scheduling model, scheduling task model is mapped to games model, manufacturing tasks of multi-customer correspond to players, sequences of all manufacturing tasks correspond to strategy sets, customer satisfaction degree on finishing time of manufacturing task corresponds to payoff function. As such, solving of schedule model is converted to seek nash equilibrium point of noncooperative games. In order to find nash equilibrium point, well considered mutual competition of multi-customer, solving algorithm of games schedule model is researched based on genetic algorithm and competitive strategy. Computational experiment shows the effectiveness of the proposed scheduling model and solving algorithm.
引用
收藏
页码:757 / 760
页数:4
相关论文
共 50 条
  • [21] A novel objective function for job-shop scheduling problem with fuzzy processing time and fuzzy due date using differential evolution algorithm
    Hu, Yanmei
    Yin, Minghao
    Li, Xiangtao
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 56 (9-12): : 1125 - 1138
  • [22] A novel objective function for job-shop scheduling problem with fuzzy processing time and fuzzy due date using differential evolution algorithm
    Yanmei Hu
    Minghao Yin
    Xiangtao Li
    The International Journal of Advanced Manufacturing Technology, 2011, 56 : 1125 - 1138
  • [23] Hybrid flow shop scheduling problem based on evolutionary multi-objective algorithm
    School of Computer Science and Technology, Harbin Institute of Technology, Harbin 150001, China
    Nanjing Li Gong Daxue Xuebao, 2006, 3 (327-331):
  • [24] HYBRID FUZZY LOGIC-BASED PARTICLE SWARM OPTIMIZATION FOR FLOW SHOP SCHEDULING PROBLEM
    Ling, Sai Ho
    Jiang, Frank
    Nguyen, Hung T.
    Chan, Kit Yan
    INTERNATIONAL JOURNAL OF COMPUTATIONAL INTELLIGENCE AND APPLICATIONS, 2011, 10 (03) : 335 - 356
  • [25] Research and Simulation on Flow-Shop Scheduling Problem based on Improved Genetic Algorithm
    Zhang Rong
    Wei Wen-gao
    Jiang Zhen-zhen
    Ma Xiu-ming
    PROCEEDINGS OF 2012 7TH INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE & EDUCATION, VOLS I-VI, 2012, : 916 - 919
  • [26] Non-permutation flow shop scheduling problem based on deep reinforcement learning
    Xiao P.
    Zhang C.
    Meng L.
    Hong H.
    Dai W.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2021, 27 (01): : 192 - 205
  • [27] Research on multi-objective flow shop scheduling optimization in supply chain environment based on Fuzzy Relevance Entropy Method
    Luo, Zhe
    Tan, Yonghong
    Zhu, Guangyu
    Xia, Yuping
    Wang, Xinyu
    ADVANCES IN MECHANICAL ENGINEERING, 2023, 15 (12)
  • [28] A hybrid multi-objective gray wolf optimization algorithm for a fuzzy blocking flow shop scheduling problem
    Yang, Zhi
    Liu, Cungen
    ADVANCES IN MECHANICAL ENGINEERING, 2018, 10 (03):
  • [29] Multi-stage hybrid evolutionary algorithm for multiobjective distributed fuzzy flow-shop scheduling problem
    Zhang, Wenqiang
    Zhang, Xiaoxiao
    Hao, Xinchang
    Gen, Mitsuo
    Zhang, Guohui
    Yang, Weidong
    MATHEMATICAL BIOSCIENCES AND ENGINEERING, 2023, 20 (03) : 4838 - 4864
  • [30] An improved multi-objective grey wolf optimization algorithm for fuzzy blocking flow shop scheduling problem
    Yang, Zhi
    Liu, Cungen
    Qin, Weixin
    2017 IEEE 2ND ADVANCED INFORMATION TECHNOLOGY, ELECTRONIC AND AUTOMATION CONTROL CONFERENCE (IAEAC), 2017, : 661 - 667