共 50 条
- [1] Research on No-wait Flow Shop Scheduling Problem with Fuzzy Due Date Based on Evolution Games 2009 2ND IEEE INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND INFORMATION TECHNOLOGY, VOL 3, 2009, : 490 - 494
- [2] Cooperative games on proportionate flow-shop scheduling problem with due-dates Kongzhi yu Juece/Control and Decision, 2022, 37 (03): : 712 - 720
- [3] A new Hybrid Particle Swarm Optimization for Solving Flow Shop Scheduling Problem with Fuzzy Due Date MANUFACTURING PROCESS TECHNOLOGY, PTS 1-5, 2011, 189-193 : 2746 - 2753
- [4] Flow-shop scheduling problem with fuzzy due window DYNAMICS OF CONTINUOUS DISCRETE AND IMPULSIVE SYSTEMS-SERIES B-APPLICATIONS & ALGORITHMS, 2006, 13 : 370 - 374
- [8] Research on Sensor Network Coverage Enhancement Based on Non-Cooperative Games CMC-COMPUTERS MATERIALS & CONTINUA, 2019, 60 (03): : 989 - 1002
- [10] A FLC-GA for fuzzy flow shop scheduling problem with distinct due window WCICA 2006: SIXTH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-12, CONFERENCE PROCEEDINGS, 2006, : 7277 - 7281