Meeting deepwater subsea-completion design challenges

被引:0
|
作者
Aldridge, D
Dodd, P
机构
来源
JOURNAL OF PETROLEUM TECHNOLOGY | 1997年 / 49卷 / 10期
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
引用
收藏
页码:1103 / 1104
页数:2
相关论文
共 50 条
  • [31] Deepwater semi upgrade nearing completion
    不详
    OIL & GAS JOURNAL, 1997, 95 (45) : 40 - 41
  • [34] Design challenges for wax in a fast-track deepwater project
    Alwazzan, Amir
    Utgard, Mark
    Barros, Dalmo
    JPT, Journal of Petroleum Technology, 2009, 61 (06): : 45 - 47
  • [36] Subsea gas compression increases chance of deepwater development
    Falcone, Gioia
    Harrison, Bob
    OIL & GAS JOURNAL, 2015, 113 (05) : 70 - +
  • [37] Measures to Prevent Subsea Wellhead Instability for Deepwater Drilling
    Su, Kan-Hua
    Liu, Ji-Lin
    Wan, Li-Fu
    Li, Meng
    MATERIALS IN ENVIRONMENTAL ENGINEERING, 2017, : 1241 - 1251
  • [38] Electrically heated systems for deepwater subsea oil flowlines
    Anon
    1600, Soc Pet Eng (SPE), Richardson (52):
  • [39] Deepwater tieback-cementing-design challenges and engineering approach
    Elhancha, Anouar
    Dooply, Mohammed
    Koons, Brian
    Saleh, Muhammad
    JPT, Journal of Petroleum Technology, 2017, 69 (02): : 46 - 48
  • [40] Reservoir management in a deepwater subsea field - The Schiehallion experience
    Govan, Alastair
    Primmer, Tim
    Douglas, Cameron
    Moodie, Neil
    Davies, Merv
    Nieuwland, Ferry
    SPE RESERVOIR EVALUATION & ENGINEERING, 2006, 9 (04) : 382 - 390