Building renovations in BIM systems

被引:2
|
作者
Smutny, Marian [1 ]
机构
[1] Czech Tech Univ, Fac Civil Engn, Thakurova 7, Prague 16629 6, Czech Republic
关键词
D O I
10.1051/matecconf/201814601006
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Renovation of buildings is a demanding challenge for computer systems. Nowadays, complex 3D models of historic buildings can be scanned and modelled, including sculptural filigrees and stucco decorations with possibility to generate different projections, cross-sections and elevations according to descriptive geometry rules. However, all of this falls within the field of "3D Modelling". BIM systems work with elements that have to be classified according to their purpose, or according to the way they are realized. The system is then able to sort, filter or group them. Also, it is able to compute their bill of quantity and quality based on their attributes. Last but not least, it has to be able to schematically display civil engineering drawings on the basis of classification of the elements which differ considerably from the display of descriptive geometry. In regular constructions, repeatability and predictability of the links between the elements suit computer systems. Thus, the issue of building renovations in BIM systems is to find a balance between modelling irregular constructions and irregular space arrangements, while maintaining the ability to interact with other BIM elements.
引用
收藏
页数:5
相关论文
共 50 条
  • [21] A Functional Element-Naming Approach for BIM Elements in Building Envelope Systems
    Hsu, Chih-Lin
    Wang, Jui-Tang
    Huang, Yu-Hsiang
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2023, 149 (06)
  • [22] Supporting building automation systems in BIM/IFC: reviewing the existing information gap
    Vieira, Renato
    Carreira, Paulo
    Domingues, Pedro
    Costa, Antonio Aguiar
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (06) : 1357 - 1375
  • [23] Automatic BIM Reconstruction for Existing Building MEP Systems from Drawing Recognition
    Wang, Dejiang
    Fang, Yuanhao
    BUILDINGS, 2025, 15 (06)
  • [24] 'RENOVATIONS'
    SHAW, RB
    POETRY, 1976, 128 (04) : 209 - 210
  • [25] Digital Planning and Building: Open BIM or Closed BIM?
    不详
    STAHLBAU, 2017, 86 (05)
  • [26] Digital Planning and Building: Open BIM or Closed BIM?
    不详
    BETON- UND STAHLBETONBAU, 2017, 112 (05) : 316 - 316
  • [27] Renovations
    Di Piero, W. S.
    POETRY, 2009, 195 (01) : 4 - 5
  • [28] BIM in Building and Infrastructure Construction
    Usala, Martina
    Praest, Barbara
    BAUINGENIEUR, 2017, 92 : A5 - A5
  • [29] BIM in Prefabrication and Modular Building
    Bonenberg, Wojciech
    Wei, Xia
    Zhou, Mo
    ADVANCES IN HUMAN FACTORS, SUSTAINABLE URBAN PLANNING AND INFRASTRUCTURE, 2019, 788 : 100 - 110
  • [30] Application of bim in building traceability
    Lee, Marco
    Wang, Yu-Ren
    Chen, Po-Jung
    Hong, Ci-Syun
    Journal of Technology, 2020, 35 (03): : 99 - 111