Scheduling Optimization for Twin ASC in an Automated Container Terminal Based on Graph Theory

被引:2
|
作者
Xu, Yifeng [1 ]
Zhu, Jin [1 ]
机构
[1] Shanghai Maritime Univ, Inst Logist Sci & Engn, Shanghai 201306, Peoples R China
关键词
STACKING CRANES; YARD CRANE; ALGORITHMS; SIMULATION; SEAPORT; MODEL; AGVS;
D O I
10.1155/2022/7641084
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Aiming at the twin automated stacking cranes (ASCs) scheduling problem in a single block of an automated container terminal, resolving conflicts between ASCs is an important point that needs to be considered. To solve this problem, a two-stage adaptive genetic algorithm (AGA) based on a graph theory model is proposed. The first stage of the algorithm reduced conflicts as much as possible by adjusting the order of container operations. In the second stage, when conflicts are unavoidable, conflicts are resolved by transforming conflicts into obstacle diagrams. Solving the completion time is to find the shortest distance in the diagram. The effectiveness of the algorithm is verified by applying the proposed algorithm to different scales of container numbers. Compared with the traditional seaside priority strategy, the graph theory model can shorten the completion time to varying degrees. For the strategy of setting the handshake area to reduce conflicts, the results show that the graph theory model makes ASC more efficient.
引用
收藏
页数:12
相关论文
共 50 条
  • [21] Study on Equipment Scheduling of ZPMC Automated Container Terminal based on Improved PSO
    Tian, Y.
    Yang, B.
    Fu, H. D.
    Yu, J. Zhu
    ELECTRICAL INFORMATION AND MECHATRONICS AND APPLICATIONS, PTS 1 AND 2, 2012, 143-144 : 879 - 884
  • [22] Sequential Optimization of a Temporary Storage Location for Cooperative Twin Overhead Shuttles in a Rail-Based Automated Container Terminal
    Kang, Bonggwon
    Kim, Bosung
    Hong, Soondo
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: SMART MANUFACTURING AND LOGISTICS SYSTEMS: TURNING IDEAS INTO ACTION, APMS 2022, PT I, 2022, 663 : 285 - 292
  • [23] Integrated Resource Assignment and Scheduling Optimization With Limited Critical Equipment Constraints at an Automated Container Terminal
    Li, Hui
    Peng, Jianbiao
    Wang, Xi
    Wan, Jinlin
    IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS, 2021, 22 (12) : 7607 - 7618
  • [24] The integrated optimization of container terminal scheduling with uncertain factors
    Lu, Yiqin
    Le, Meilong
    COMPUTERS & INDUSTRIAL ENGINEERING, 2014, 75 : 209 - 216
  • [25] Yard Crane Scheduling Method Based on Deep Reinforcement Learning for the Automated Container Terminal
    Wang W.
    Huang Z.
    Zhuang Z.
    Fang H.
    Qin W.
    Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2024, 60 (06): : 44 - 57
  • [26] Scheduling of container-handling equipment during the loading process at an automated container terminal
    Luo, Jiabin
    Wu, Yue
    COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 149
  • [27] Optimization of Container Handling Systems in Automated Maritime Terminal
    Dkhil, Hamdi
    Yassine, Adnan
    Chabchoub, Habib
    ADVANCED METHODS FOR COMPUTATIONAL COLLECTIVE INTELLIGENCE, 2013, 457 : 301 - +
  • [28] Storage Space Allocation and Twin Automated Stacking Cranes Scheduling in Automated Container Terminals
    Fan, Houming
    Peng, Wenhao
    Ma, Mengzhi
    Yue, Lijun
    IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS, 2022, 23 (09) : 14336 - 14348
  • [29] Real-time scheduling for twin RMGs in an automated container yard
    Park, Taejin
    Choe, Ri
    Ok, Seung Min
    Ryu, Kwang Ryel
    OR SPECTRUM, 2010, 32 (03) : 593 - 615
  • [30] Real-time scheduling for twin RMGs in an automated container yard
    Taejin Park
    Ri Choe
    Seung Min Ok
    Kwang Ryel Ryu
    OR Spectrum, 2010, 32 : 593 - 615