Interval Scheduling to Maximize Bandwidth Provision

被引:0
|
作者
Shalom, Mordechai [1 ]
Wong, Prudence W. H. [1 ]
Zaks, Shmuel [1 ]
机构
[1] Tel Hai Coll, IL-12210 Upper Galilee, Israel
关键词
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
引用
收藏
页数:1
相关论文
共 50 条
  • [31] Scheduling the Harvest of Florida Oranges to Maximize Juice Production
    Searcy, Jacob
    Roka, Fritz
    Spreen, Thomas
    PROCEEDINGS OF THE FLORIDA STATE HORTICULTURAL SOCIETY, VOL 121, 2008, 2008, 121 : 55 - 60
  • [32] A scheduling algorithm to maximize storm throughput in heterogeneous cluster
    Hamid Nasiri
    Saeed Nasehi
    Arman Divband
    Maziar Goudarzi
    Journal of Big Data, 10
  • [33] A scheduling algorithm to maximize storm throughput in heterogeneous cluster
    Nasiri, Hamid
    Nasehi, Saeed
    Divband, Arman
    Goudarzi, Maziar
    JOURNAL OF BIG DATA, 2023, 10 (01)
  • [34] Online scheduling of bounded length jobs to maximize throughput
    Christoph Dürr
    Łukasz Jeż
    Nguyen Kim Thang
    Journal of Scheduling, 2012, 15 : 653 - 664
  • [35] Online scheduling of bounded length jobs to maximize throughput
    Duerr, Christoph
    Jez, Lukasz
    Nguyen Kim Thang
    JOURNAL OF SCHEDULING, 2012, 15 (05) : 653 - 664
  • [36] Online Scheduling of Bounded Length Jobs to Maximize Throughput
    Duerr, Christoph
    Jez, Lukasz
    Nguyen, Kim Thang
    APPROXIMATION AND ONLINE ALGORITHMS, 2010, 5893 : 116 - +
  • [37] Wedding Photography Service Scheduling to Maximize Customer Satisfaction
    Wang Jun-qiang
    Guo Yin-zhou
    Cu Fu-dong
    Zhang Cheng-wu
    Wang Shuo
    Sun Shu-dong
    2013 32ND CHINESE CONTROL CONFERENCE (CCC), 2013, : 2627 - 2632
  • [38] ON SCHEDULING SERIES-PARALLEL DAGs TO MAXIMIZE AREA
    Cordasco, Gennaro
    Rosenberg, Arnold L.
    INTERNATIONAL JOURNAL OF FOUNDATIONS OF COMPUTER SCIENCE, 2014, 25 (05) : 597 - 621
  • [39] Scheduling Tasks to Maximize Usage of Aggregate Variables in Place
    Abu-Mahmeed, Samah
    McCosh, Cheryl
    Budimlic, Zoran
    Kennedy, Ken
    Ravindran, Kaushik
    Hogan, Kevin
    Austin, Paul
    Rogers, Steve
    Kornerup, Jacob
    COMPILER CONSTRUCTION, PROCEEDINGS, 2009, 5501 : 204 - +
  • [40] THE SCHEDULING OF ACTIVITIES TO MAXIMIZE THE NET PRESENT VALUE OF PROJECTS
    ELMAGHRABY, SE
    HERROELEN, WS
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 49 (01) : 35 - 49