The Methodology for Simultaneous Scheduling and Energy Auctioning

被引:0
|
作者
Ayuyev, B. I.
Mashalov, E.
Neuymin, V. G.
Nikishin, K.
Shubin, N. G.
机构
关键词
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper presents one of the OPF methodologies that allow performing scheduling and market auctioning simultaneously. The problem uses a non-linear model of electrical network, which allows taking into account voltage constraints, injections of reactive power and line current constraints. Consideration is also given to integral generation output constraints, ramp rate, and reserve constraints. Transformer taps and reactive power sources are scheduled to resolve congestion management issues and to minimize power losses. The proposed algorithm is based on an interior-point method. There are two forms of objective functions provided: one is for constant and another one is for elastic power consumption. These problems can be solved with variable dispatch intervals during planning period. There were several techniques developed to increase computational performance of the discussed algorithm. The proposed methodology is implemented in the form of "LincorWin" software, which is used by the System Operator to solve the problems of daily scheduling and nodal price analysis for a model with more than 6,500 nodes. This paper also includes a discussion of several possible applications of the methodology for the real-time scheduling and balancing market issues.
引用
收藏
页码:216 / 220
页数:5
相关论文
共 50 条
  • [41] Simultaneous components sizing and flight scheduling for an hybrid aerial vehicle as a multi-energy mobile microgrid
    Salehpour, Mohammad Javad
    Zarenia, Omid
    Wang, Jin
    Yu, Xiaofeng
    INTERNATIONAL TRANSACTIONS ON ELECTRICAL ENERGY SYSTEMS, 2021, 31 (08)
  • [42] Using game theory for scheduling tasks on multi-core processors for simultaneous optimization of performance and energy
    Ahmad, Ishfaq
    Ranka, Sanjay
    Khan, Samee Ullah
    2008 IEEE INTERNATIONAL SYMPOSIUM ON PARALLEL & DISTRIBUTED PROCESSING, VOLS 1-8, 2008, : 2645 - +
  • [43] IMPROVING SIMULTANEOUS SCHEDULING OF PRIMARY RESERVE AND ENERGY UTILIZING FAST RAMP RATE CAPABILITY OF GENERATING UNITS
    Mashhadi, M. Rajabi
    Ghazizadeh, M. S.
    Javidi, M. H.
    IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF ELECTRICAL ENGINEERING, 2011, 35 (E2) : 109 - 125
  • [44] A flexible crane scheduling methodology for container terminals
    Guvenc Dik
    Erhan Kozan
    Flexible Services and Manufacturing Journal, 2017, 29 : 64 - 96
  • [45] A new simulation methodology for master production scheduling
    Davis, WJ
    Brook, A
    Lee, MS
    SMC '97 CONFERENCE PROCEEDINGS - 1997 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-5: CONFERENCE THEME: COMPUTATIONAL CYBERNETICS AND SIMULATION, 1997, : 1808 - 1813
  • [46] A simultaneous methodology for the optimal design of integrated water and energy networks considering pressure drops in process industries
    Torkfar, Fardin
    Avami, Akram
    PROCESS SAFETY AND ENVIRONMENTAL PROTECTION, 2016, 103 : 442 - 454
  • [47] On task scheduling accuracy: Evaluation methodology and results
    Sinnen, O
    Sousa, L
    JOURNAL OF SUPERCOMPUTING, 2004, 27 (02): : 177 - 194
  • [48] Simultaneous integration of water and energy on conceptual methodology for both single- and multi-contaminant problems
    Hou, Yanlong
    Wang, Jingtao
    Chen, Zhiyou
    Li, Xiaoduan
    Zhang, Jinli
    CHEMICAL ENGINEERING SCIENCE, 2014, 117 : 436 - 444
  • [49] A METHODOLOGY FOR LABOR SCHEDULING IN A SERVICE OPERATING SYSTEM
    BECHTOLD, SE
    SHOWALTER, MJ
    DECISION SCIENCES, 1987, 18 (01) : 89 - 107
  • [50] A genetic algorithm methodology for complex scheduling problems
    Norman, BA
    Bean, JC
    NAVAL RESEARCH LOGISTICS, 1999, 46 (02) : 199 - 211