Method of enterprise marketing risk early-warning and the index system construction

被引:0
|
作者
Zhou Mei-hua [1 ]
Wang Fu-dong [1 ]
Zhang Hong-hong [1 ]
Meng Jan [1 ]
机构
[1] China Univ Min & Technol, Sch Management, Xuzhou 221008, Peoples R China
关键词
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
The avoiding of marketing risk is the critical safeguard for the existence and development of enterprises, it is also an important content in modern business management. The risk early-warning indexes act as the carriers of the information in enterprise marketing activities and take the duty of providing the information for the enterprise marketing early-warning system. The index is also the basis and core of effective operation in the system. The index system describes a comprehensive goal, it aims to seek a group to have qualitative representative and at the same time it can comprehensively reflect the synthesis goal and the requested characteristic index from various aspects, these indexes and the combinations can appropriately express the synthesis judgment of people, that is also the purpose of the establishment of the index system. The article had analyzed the enterprise marketing risk influence factor from the interior and exterior perspective. It constructed the risk early-warning index system by using the system analysis and the AHP method, rejected the small technical progress index factor through the principal components analysis method, and carried on the actual description of the concrete content of each index. Comparing with the existent index system, the index system constructed in this article is not only relatively succinct in exterior target, it increases the establishment of enterprise interior marketing risk index at the same time, this index system is relatively comprehensive, and in the end, using the BP artificial neural networks, it obtained satisfactory result.
引用
收藏
页码:718 / +
页数:2
相关论文
共 50 条
  • [21] Construction of Early-warning City Safe System Based on the FAHP
    Jiao, Hu
    PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON PRODUCT INNOVATION MANAGEMENT, VOLS I AND II, 2008, : 1040 - 1044
  • [22] Design for Early Warning Index System of the Risk in Enterprise Internationalized Supply Chain
    Zhang, Guohua
    Yang, Jing
    2008 INTERNATIONAL SEMINAR ON FUTURE INFORMATION TECHNOLOGY AND MANAGEMENT ENGINEERING, PROCEEDINGS, 2008, : 161 - +
  • [23] Application of Rough Sets in the Virtual Enterprise Knowledge Sharing Risk Early-warning
    Shi, Cheng-Dong
    Bian, Dun-Xin
    2010 SECOND ETP/IITA WORLD CONGRESS IN APPLIED COMPUTING, COMPUTER SCIENCE, AND COMPUTER ENGINEERING, 2010, : 102 - 105
  • [24] risk early-warning for enterprise' technological innovation based on rough sets and SVM
    Jin, Hongxia
    Dong, Lianjie
    Ya, Heping
    Cui, Yushu
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 10651 - +
  • [25] Early-warning technology study of chemical enterprise on risk monitoring and safety management
    Deng Qigen
    Cao Qinggui
    Wang Yan
    Progress in Mining Science and Safety Technology, Pts A and B, 2007, : 1138 - 1141
  • [26] Virtual Logistics Enterprise Knowledge Sharing Risk Early-Warning by Fuzzy Sets
    Shi, Cheng-dong
    Bian, Dun-xin
    2009 2ND IEEE INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND INFORMATION TECHNOLOGY, VOL 3, 2009, : 305 - 308
  • [27] Construction and demonstration of early-warning evaluation index system of poverty return from the perspective of rural revitalization
    Fang J.
    Applied Mathematics and Nonlinear Sciences, 2024, 9 (01)
  • [28] Risk Index Early-warning of Smart Grid Based on Neural Network
    Ji, Xiu
    Ji, Hui
    Yao, Qiang
    Wang, Ming-chen
    2017 4TH INTERNATIONAL CONFERENCE ON SYSTEMS AND INFORMATICS (ICSAI), 2017, : 1723 - 1727
  • [29] Research on early-warning and control model of enterprise finance based on System Dynamics
    Huang, Yang
    PROCEEDINGS OF THE FIFTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2011, : 294 - 298
  • [30] Research on the Application of RBF NN on Enterprise Early-warning
    Yang, Shuping
    PROCEEDINGS OF THE 2009 INTERNATIONAL CONFERENCE ON COMPUTER TECHNOLOGY AND DEVELOPMENT, VOL 2, 2009, : 126 - 129