Scheduling in iron ore open-pit mining

被引:8
|
作者
Ibrahimov, Maksud [1 ]
Mohais, Arvind [1 ]
Schellenberg, Sven [2 ]
Michalewicz, Zbigniew [1 ,3 ,4 ]
机构
[1] Univ Adelaide, Sch Comp Sci, Adelaide, SA 5005, Australia
[2] RMIT Univ, Sch Comp Sci & IT, Melbourne, Vic, Australia
[3] Polish Acad Sci, Inst Comp Sci, PL-01237 Warsaw, Poland
[4] Polish Japanese Inst Informat Technol, PL-02008 Warsaw, Poland
关键词
Open-pit mining; Scheduling; Metaheuristics; Real-world application; SEARCH ALGORITHM;
D O I
10.1007/s00170-014-5619-8
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
During the last few years, most production-based businesses have been under enormous pressure to improve their top-line growth and bottom-line savings. As a result, many companies are turning to systems and technologies that can help optimise their supply chain activities. In this paper, we discuss a real-world application of scheduling in the mining industry. This is a highly constrained problem with some of the constraints changing over time. The objective is to generate a plan that meets the quality and tonnage targets by utilising the provided equipment and machines. The mathematical model is described in detail, and a three-module complex algorithm based on computational intelligence is proposed. The main software functionality is also described. The developed software is currently in the production use.
引用
收藏
页码:1021 / 1037
页数:17
相关论文
共 50 条
  • [21] SELECTIVE OPEN-PIT MINING AND ORE TREATMENT AT CROYDON GOLD MINE, NORTH QUEENSLAND
    CHILD, R
    STAFFORD, G
    KANDEMIR, H
    NORTH QUEENSLAND GOLD 89 CONFERENCE: A CONFERENCE FOCUSED ON THE GOLD EXPLORATION, MINING AND PROCESSING INDUSTRY OF NORTH QUEENSLAND, 1989, : 141 - 153
  • [22] Stability analysis of slope under mining for resident ore body outside the open-pit
    Zhang Ya-Bin
    Gan De-Qing
    Chen Chao
    ROCK STRESS AND EARTHQUAKES, 2010, : 585 - 588
  • [23] Stochastic Open-Pit Mine Production Scheduling: A Case Study of an Iron Deposit
    Maleki, Mohammad
    Jelvez, Enrique
    Emery, Xavier
    Morales, Nelson
    MINERALS, 2020, 10 (07) : 1 - 19
  • [24] Scheduling of open-pit phosphate mine extraction
    Azzamouri, Ahlam
    Fenies, Pierre
    Fontane, Frederic
    Giard, Vincent
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (23) : 7122 - 7141
  • [25] SPOTLIGHT ON OPEN-PIT AND STRIP-MINING
    ALBERTS, BC
    JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1984, 84 (08): : 260 - 262
  • [26] Open-pit mining geomorphic feature characterisation
    Chen, Jianping
    Li, Ke
    Chang, Kuo-Jen
    Sofia, Giulia
    Tarolli, Paolo
    INTERNATIONAL JOURNAL OF APPLIED EARTH OBSERVATION AND GEOINFORMATION, 2015, 42 : 76 - 86
  • [27] Energy analysis of open-pit coal mining
    Kurlenya, MV
    Tanaino, AS
    JOURNAL OF MINING SCIENCE, 1997, 33 (05) : 453 - 462
  • [28] HYDROGEOLOGIC RAMIFICATIONS OF OPEN-PIT ANTHRACITE MINING
    BAIR, ES
    PARIZEK, RR
    GROUND WATER, 1979, 17 (05) : 493 - 494
  • [29] A formulation for optimum risk in open-pit mining
    Venter, J.
    Wesseloo, J.
    Maybee, B.
    JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2024, 124 (08) : 461 - 472
  • [30] SEISMIC HAZARD AND RISK IN OPEN-PIT MINING
    SKIPP, BO
    TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING INDUSTRY, 1984, 93 (OCT): : A180 - A192