Integrated Modeling of Process Routes Planning and Scheduling based on Network Diagram

被引:0
|
作者
Su, Yingying [1 ]
Liang, Di [1 ]
Dong, Hai [1 ]
机构
[1] Shenyang Univ, Sch Mech Engn, Shenyang 110044, Liaoning, Peoples R China
关键词
MPRR network diagram; Process routes planning; Scheduling; Modeling;
D O I
10.4028/www.scientific.net/AMR.753-755.1922
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Modeling method based on network diagram was proposed to realize integrated modeling of process routes planning and scheduling. A model of multiple process routes and resource (MPRR) network diagram was built, which applied the network diagram expression and represented the precedence constraint relationship among operations and resource conditions. In the model, the workpiece, operation and machine are joined together as a basic optimization cell to realize concurrent and holistic optimization for process routes planning and scheduling. An example was studied and the integrated model of process routes planning and scheduling was built.
引用
收藏
页码:1922 / 1926
页数:5
相关论文
共 50 条
  • [21] An integrated modeling framework for capacity planning and production scheduling
    Wang, FY
    Chua, TJ
    Liu, W
    Yan, WJ
    Cai, TX
    2005 International Conference on Control and Automation (ICCA), Vols 1 and 2, 2005, : 1137 - 1142
  • [22] Decomposition algorithms for the integrated process planning and scheduling problem
    Barzanji, Ramin
    Naderi, Bahman
    Begen, Mehmet A.
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2020, 93
  • [23] An integrated approach to tolerance allocation, process planning and scheduling
    Anand, S
    Pallapati, RP
    Uttam, S
    McCord, C
    TRANSACTIONS OF THE NORTH AMERICAN MANUFACTURING RESEARCH INSTITUTE OF SME, VOL XXX, 2002, 2002, : 605 - 612
  • [24] INTEGRATED PROCESS PLANNING AND SCHEDULING USING GENETIC ALGORITHMS
    Chaudhry, Imran Ali
    Usman, Muhammad
    TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2017, 24 (05): : 1401 - 1409
  • [25] A Particle Swarm Optimization for Integrated Process Planning and Scheduling
    Zhu, Hengyun
    Ye, Wenhua
    Bei, Guangxia
    2009 IEEE 10TH INTERNATIONAL CONFERENCE ON COMPUTER-AIDED INDUSTRIAL DESIGN & CONCEPTUAL DESIGN, VOLS 1-3: E-BUSINESS, CREATIVE DESIGN, MANUFACTURING - CAID&CD'2009, 2009, : 1070 - 1074
  • [26] Modelling integrated process planning and scheduling for agile manufacturing
    Hall, DM
    Zhao, W
    ADVANCES IN MANUFACTURING TECHNOLOGY XII, 1998, : 461 - 466
  • [27] More MILP models for integrated process planning and scheduling
    Jin, Liangliang
    Tang, Qiuhua
    Zhang, Chaoyong
    Shao, Xinyu
    Tian, Guangdong
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (14) : 4387 - 4402
  • [28] Integrated process planning and scheduling in holonic manufacturing systems
    Sugimura, N
    Hino, R
    Moriwaki, T
    PROCEEDINGS OF THE 2001 IEEE INTERNATIONAL SYMPOSIUM ON ASSEMBLY AND TASK PLANNING (ISATP2001): ASSEMBLY AND DISASSEMBLY IN THE TWENTY-FIRST CENTURY, 2001, : 250 - 255
  • [29] Manufacturing responsiveness through integrated process planning and scheduling
    Gindy, NN
    Saad, SM
    Yue, Y
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1999, 37 (11) : 2399 - 2418
  • [30] A grammatical optimization approach for integrated process planning and scheduling
    Adil Baykasoğlu
    Lale Özbakır
    Journal of Intelligent Manufacturing, 2009, 20 : 211 - 221