A Probabilistic Day-ahead Scheduling with Considering Wind Power Curtailment

被引:0
|
作者
Wang, Chen [1 ]
Liu, Tianbin [1 ]
Zhu, Zhigang [1 ]
Cheng, Jie [2 ]
Wei, Cong [2 ]
Wu, Yayi [3 ]
Lin, Chun [3 ]
Bai, Fan [3 ]
机构
[1] State Grid Corp China, Cent China Branch, Wuhan, Hubei, Peoples R China
[2] Powerchina Hubei Elect Engn Corp, Wuhan, Hubei, Peoples R China
[3] Wuhan Univ, Sch Elect Engn, Wuhan, Hubei, Peoples R China
关键词
prediction error; wind power curtailment; unit commitment; chance constraint programming; GENERATION; DISPATCH;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Large-scale wind power integration aggravates the uncertainty and complexity of the day-ahead scheduling (DAS) problem. Based on the uncertainty of prediction errors, an overall system prediction error integrating with all uncertain prediction errors is put forward to reduce the number of uncertain variables into one, which effectively simplifies the DAS model. By considering the different prediction error distributions of wind output and its influence on the reserve capacity, the DAS model is further refined. What's more, wind power curtailment (WPC) as a decision variable is introduced, which makes the uncertain wind power becoming partially controlled. Thus, based on the chance constraint programming (CCP), a probabilistic DAS model with considering WPC is established in this paper. Results show that the WPC and the overall prediction error can effectively enhance the economy and calculation of the system scheduling.
引用
收藏
页码:737 / 741
页数:5
相关论文
共 50 条
  • [41] Two-stage day-ahead and intra-day scheduling considering electric arc furnace control and wind power modal decomposition
    Zhao, Xudong
    Wang, Yibo
    Liu, Chuang
    Cai, Guowei
    Ge, Weichun
    Wang, Bowen
    Wang, Dongzhe
    Shang, Jingru
    Zhao, Yiru
    ENERGY, 2024, 302
  • [42] Optimal Scheduling of a Hybrid Wind-Battery Power Plant in the Day-Ahead and Reserve Markets Considering Battery Degradation Cost
    Ghanaee, Elahe
    Ignacio Perez-Diaz, Juan
    Fernandez-Munoz, Daniel
    Najera, Jorge
    Chazarra, Manuel
    Castano-Solis, Sandra
    2024 INTERNATIONAL CONFERENCE ON SMART ENERGY SYSTEMS AND TECHNOLOGIES, SEST 2024, 2024,
  • [43] Day-Ahead Robust Optimal Scheduling of Hydro-Wind-PV-Storage Complementary System Considering the Steadiness of Power Delivery
    Guo Y.
    Ming B.
    Huang Q.
    Wang Y.
    Li Y.
    Diangong Jishu Xuebao/Transactions of China Electrotechnical Society, 2023, 38 (09): : 2350 - 2363
  • [44] Day-ahead generation scheduling and operation simulation considering demand response in large-capacity wind power integrated systems
    Wang, Beibei
    Liu, Xiaocong
    Li, Yang
    Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2013, 33 (22): : 35 - 44
  • [45] Day-ahead Scheduling Strategy for Bulk Power System Based on Accurate Prediction of Wind Power Output
    Wang, Guannan
    Wu, Xinyue
    Fan, Xiaowei
    Wang, Bin
    Zhang, Jun
    Liu, Haitao
    2023 IEEE/IAS INDUSTRIAL AND COMMERCIAL POWER SYSTEM ASIA, I&CPS ASIA, 2023, : 462 - 466
  • [46] Coordinated Day-Ahead Optimal Dispatch Considering Wind Power Consumption and the Benefits of Power Generation Group
    Ma X.
    Wang G.
    Zhu S.
    Yu S.
    Diangong Jishu Xuebao/Transactions of China Electrotechnical Society, 2021, 36 (03): : 579 - 587
  • [48] Day-Ahead Scheduling for Renewable Energy Generation Systems considering Concentrating Solar Power Plants
    Lu, Xiaojuan
    Cheng, Leilei
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021
  • [49] A Day-ahead Scheduling Optimization Model of Multi-Microgrid Considering Interactive Power Control
    He, Lijun
    Wei, Zhaobin
    Yan, Hai
    Xv, Kang-Yi
    Zhao, Meng-yu
    Cheng, Shan
    2019 4TH INTERNATIONAL CONFERENCE ON INTELLIGENT GREEN BUILDING AND SMART GRID (IGBSG 2019), 2019, : 666 - 669
  • [50] Day-ahead optimal scheduling for cluster building with integrated energy system considering power sharing
    Hu P.
    Ai X.
    Yang Z.
    Wu J.
    Guo L.
    Li Q.
    Zhang R.
    Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2019, 39 (08): : 239 - 245