Suggestions for Temporary Construction Facilities' Layout Problems in Large-Scale Construction Projects

被引:10
|
作者
Xu, Jiuping [1 ,2 ]
Song, Xiaoling [2 ]
机构
[1] Sichuan Univ, State Key Lab Hydraul & Mt River Engn, Chengdu 610064, Peoples R China
[2] Sichuan Univ, Uncertainty Decis Making Lab, Chengdu 610064, Peoples R China
基金
中国国家自然科学基金;
关键词
Innovation; Temporary structures; Construction management; Project management; Temporary construction facilities (TCF); Temporary construction facilities' layout problems (TCFLP); Innovative trilogy; Combined qualitative and quantitative methods; Jinping-I; Project planning and design; SITE LAYOUT; DYNAMIC LAYOUT; SAFETY;
D O I
10.1061/(ASCE)CO.1943-7862.0000841
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Temporary construction facilities' layout problems (TCFLPs) are crucial in large-scale construction projects. Well-designed TCFLPs can improve overall effectiveness and facilitate an efficient construction process. This technical note presents an innovative trilogy for positioning appropriate temporary construction facilities (TCFs) in ideal locations based on a qualitative-quantitative-qualitative methodology. In contrast to previous research, the trilogy integrates existing techniques with some qualitative analysis to facilitate operations so that the operability of TCFLPs in practical situations is improved. First, a qualitative-based analysis index is proposed to determine basic properties for the predetermined project. Following this, optimization models are established to obtain satisfactory solutions based on practical requirements and constraints in a quantitative way. Finally, an evaluation index is built to evaluate and adjust some of the TCFs obtained from the previous procedure to better meet the practical demands. The complete process is illustrated using a realistic layout problem from the Jinping-I hydropower station project in China, and the results show that the proposed combined methods can be applied to real-world TCFLPs.
引用
收藏
页数:7
相关论文
共 50 条
  • [31] Large-scale chemical projects environmental management during project construction
    Liu Liying
    Zhou Gang
    2012 WORLD AUTOMATION CONGRESS (WAC), 2012,
  • [32] Competition of large-scale projects: The game model of gas pipeline construction
    S. A. Brykalov
    M. A. Melentsova
    O. I. Nikonov
    Automation and Remote Control, 2007, 68 : 1745 - 1755
  • [33] Model of monitoring management for dynamic evaluation on large-scale construction projects
    Song, Yanqiu
    Dai, Dashuang
    Wu, Gang
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 7480 - 7483
  • [34] Beyond Site Material Handling and Transportation in Large-Scale Construction Projects
    Abeysinghe, A. M. G. P.
    Waidyasekara, K. G. A. S.
    Melagoda, D. G.
    2018 MORATUWA ENGINEERING RESEARCH CONFERENCE (MERCON) 4TH INTERNATIONAL MULTIDISCIPLINARY ENGINEERING RESEARCH CONFERENCE, 2018, : 66 - 71
  • [35] Study on knowledge management modes of large-scale scientific construction projects
    Zhang, Lingfing
    Liu, Libing
    Li, Jun
    PROCEEDINGS OF THE 2008 INTERNATIONAL CONFERENCE ON E-RISK MANAGEMENT (ICERM 2008), 2008, : 763 - 768
  • [36] Integrating Design Freeze in to large-scale construction projects in Sri Lanka
    Hemal, R. M. N.
    Waidyasekara, K. G. A. S.
    Ekanayake, E. M. A. C.
    2017 3RD INTERNATIONAL MORATUWA ENGINEERING RESEARCH CONFERENCE (MERCON), 2017, : 259 - 264
  • [37] CAUSES AND PREVENTION OF PROBLEMS IN LARGE-SCALE PRESTRESSED CONCRETE CONSTRUCTION
    GERWICK, BC
    JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1982, 27 (03): : 58 - 75
  • [38] A Solution to the Problems in Large-Scale Corpus Construction for Police Translation
    Hao, Ding
    PROCEEDINGS OF THE FIFTEENTH INTERNATIONAL CONFERENCE ON LAW AND LANGUAGE OF THE INTERNATIONAL ACADEMY OF LINGUISTIC LAW (IALL2017): LAW, LANGUAGE AND JUSTICE, 2017, : 232 - 239
  • [39] LADEGA: Unequal facilities layout design using a genetic algorithm for large-scale problems
    Tavakkoli-Moghaddam, R
    PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, 2000, : 237 - 243
  • [40] Multistakeholder Conflict Minimization-Based Layout Planning of Construction Temporary Facilities
    Song, Xiaoling
    Zhong, Lin
    Zhang, Zhe
    Xu, Jiuping
    Shen, Charles
    Pena-Mora, Feniosky
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2018, 32 (02)