Mechanical Monitoring Issues in Preparation to Next Step of Wendelstein 7-X Operation

被引:5
|
作者
Bykov, Victor [1 ]
Carls, Andre [1 ]
Zhu, Jiawu [1 ]
van Eeten, Paul [1 ]
Wegener, Lutz [1 ]
Bosch, Hans-Stephan [1 ]
机构
[1] EURATOM, Max Planck Inst Plasma Phys, D-17491 Greifswald, Germany
关键词
Numerical finite-element (FE) analysis; stellarator; structural monitoring; Wendelstein 7-X (W7-X); MAGNET SYSTEM;
D O I
10.1109/TPS.2017.2786744
中图分类号
O35 [流体力学]; O53 [等离子体物理学];
学科分类号
070204 ; 080103 ; 080704 ;
摘要
The largest modular stellarator Wendelstein 7-X (W7-X) has successfully passed the first phase of operation in Greifswald, Germany. The sophisticated W7-X superconducting magnet system (MS) with its nonlinear support system has been carefully monitored using an extensive set of mechanical and temperature sensors. This paper focuses on detailed consideration of cyclic MS behavior during operation with limiter configurations of plasma. Measurement results are carefully compared with predictions from updated numerical models and critical issues are highlighted. As a result, the structural monitoring tool is extended to follow enhanced requirements and expectations. This paper is a preparation for upcoming more demanding phases with longer plasma pulses to guarantee safe and reliable W7-X operation with different divertor and scraper element configurations. The procedure to establish required sensor configurations, and to analyze and release new plasma regimes being compatible with W7-X component design values is also described.
引用
收藏
页码:1086 / 1094
页数:9
相关论文
共 50 条
  • [41] Wendelstein 7-X at the transition to assembly
    Wegener, L.
    ATW-INTERNATIONAL JOURNAL FOR NUCLEAR POWER, 2007, 52 (8-9): : 558 - +
  • [42] Quality management for WENDELSTEIN 7-X
    Feist, JH
    Bramow, HJ
    Bräuer, T
    Gliege, G
    Kamionka, U
    Krause, B
    Pieger-Frey, M
    Wanner, M
    FUSION ENGINEERING AND DESIGN, 2001, 58-59 : 809 - 813
  • [43] Manufacturing, installation, commissioning and operation of endoscopes for monitoring water-cooled divertor in Wendelstein 7-X
    Fellinger, Joris
    Schuelke, Mathias
    Krause, Marco
    Gao, Yu
    FUSION ENGINEERING AND DESIGN, 2024, 203
  • [44] WENDELSTEIN 7-X at the transition to assembly
    Wegener, L
    FUSION ENGINEERING AND DESIGN, 2005, 74 (1-4) : 41 - 48
  • [45] PROGRESS TOWARDS WENDELSTEIN 7-X
    Rummel, Thomas
    FUSION SCIENCE AND TECHNOLOGY, 2013, 64 (03) : 387 - 396
  • [46] Status of Wendelstein 7-X construction
    Schauer, F.
    FUSION ENGINEERING AND DESIGN, 2007, 82 (5-14) : 443 - 453
  • [47] The layout of the WENDELSTEIN 7-X magnet
    Sapper, J
    Gardebrecht, W
    Kerl, F
    Schoenewolf, I
    FUSION ENGINEERING AND DESIGN, 2001, 58-59 : 237 - 240
  • [48] Preparation for commissioning of structural sensors of Wendelstein 7-X magnet system
    Fellinger, Joris
    Egorov, Konstantin
    Bykov, Victor
    Schauer, Felix
    FUSION ENGINEERING AND DESIGN, 2015, 98-99 : 1048 - 1052
  • [49] The WENDELSTEIN 7-X mechanical structure support elements: Design and tests
    Gasparotto, M
    Elio, F
    Heinemann, B
    Jaksic, N
    Mendelevitch, B
    Simon-Weidner, J
    Streibl, B
    FUSION ENGINEERING AND DESIGN, 2005, 74 (1-4) : 161 - 165
  • [50] Refrigerator operation during commissioning and first plasma operations of Wendelstein 7-X
    Dhard, Chandra Prakash
    Nagel, Michael
    Bau, Holger
    Raatz, Sylvio
    Meyer, Uwe
    Rummel, Thomas
    FUSION ENGINEERING AND DESIGN, 2017, 123 : 111 - 114