Competence-Based Performance Analysis of U-Shaped Assembly Lines

被引:2
|
作者
Korytkowski, Przemyslaw [1 ]
Malachowski, Bartlomiej [1 ]
机构
[1] West Pomeranian Univ Technol Szczecin, Fac Comp Sci, Ul Zolnierska 49, PL-71210 Szczecin, Poland
关键词
U-shaped lines; Competences; Multi-skill; Performance evaluation; BALANCING PROBLEM; MODEL;
D O I
10.1007/978-3-319-64465-3_21
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The paper presents a performance analysis of a u-shaped assembly line taking into account the competences of multi-skilled workers. This arrangement requires multi-skilled operators to serve on several different processes and machines. A multi-skilled worker can possess many skills at various levels. These competences translate into varying performances of individual operators and as a result on the performance of the whole line. In this paper we use a Hierarchical Competence Model to estimate the performance of a u-shaped assembly line knowing the required and possessed competences.
引用
收藏
页码:209 / 216
页数:8
相关论文
共 50 条
  • [21] Terahertz chiral metamaterial based on complementary U-shaped structure assembly
    Cheng, Yongzhi
    Huang, Quanjun
    Nie, Yan
    Gong, Rongzhou
    2012 10TH INTERNATIONAL SYMPOSIUM ON ANTENNAS, PROPAGATION & EM THEORY (ISAPE), 2012, : 706 - 709
  • [22] Research of Sequencing Problem of Mixed-Model U-Shaped Assembly Lines Based on NSGA-II
    Lu Jiansha
    Li Xiulin
    Huang Zhenxiang
    Chai Guozhong
    PROCEEDINGS OF THE 15TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS A-C, 2008, : 2098 - 2102
  • [23] Performance analysis of U-shaped patch configurations for Terahertz applications
    Varshini, G.
    Krishna, M. V. S.
    Sowjanya, M.
    Haripriya, G.
    Sujatha, M.
    2017 INTERNATIONAL CONFERENCE OF ELECTRONICS, COMMUNICATION AND AEROSPACE TECHNOLOGY (ICECA), VOL 1, 2017, : 533 - 537
  • [24] Mixed-model U-shaped assembly lines: Balancing and comparing with straight lines with buffers and parallel workstations
    Tiacci, Lorenzo
    JOURNAL OF MANUFACTURING SYSTEMS, 2017, 45 : 286 - 305
  • [25] Balancing U-shaped assembly lines with resource dependent task times: A Simulated Annealing approach
    Jayaswal, Sachin
    Agarwal, Prashant
    JOURNAL OF MANUFACTURING SYSTEMS, 2014, 33 (04) : 522 - 534
  • [26] Balancing of mixed-model parallel U-shaped assembly lines considering model sequences
    Kucukkoc, Ibrahim
    Zhang, David Z.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (20) : 5958 - 5975
  • [27] A branch and bound method for the line balancing problem in U-shaped assembly lines with equipment requirements
    Ogan, Dilek
    Azizoglu, Meral
    JOURNAL OF MANUFACTURING SYSTEMS, 2015, 36 : 46 - 54
  • [28] Application of Particle Swarm Optimization to Maximize Efficiency of Straight and U-Shaped Robotic Assembly Lines
    Janardhanan, Mukund Nilakantan
    Nielsen, Peter
    Ponnambalam, S. G.
    DISTRIBUTED COMPUTING AND ARTIFICIAL INTELLIGENCE, (DCAI 2016), 2016, 474 : 525 - 533
  • [29] Optimal Balancing of Multi-Objective U-Shaped Assembly Lines using the TSGA Method
    Suwannarongsri, S.
    Puangdownreong, D.
    IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 307 - +
  • [30] Construction of a chiral metamaterial with a U-shaped resonator assembly
    Xiong, Xiang
    Sun, Wei-Hua
    Bao, Yong-Jun
    Wang, Mu
    Peng, Ru-Wen
    Sun, Cheng
    Lu, Xiang
    Shao, Jun
    Li, Zhi-Feng
    Ming, Nai-Ben
    PHYSICAL REVIEW B, 2010, 81 (07):