Competence-Based Performance Analysis of U-Shaped Assembly Lines

被引:2
|
作者
Korytkowski, Przemyslaw [1 ]
Malachowski, Bartlomiej [1 ]
机构
[1] West Pomeranian Univ Technol Szczecin, Fac Comp Sci, Ul Zolnierska 49, PL-71210 Szczecin, Poland
关键词
U-shaped lines; Competences; Multi-skill; Performance evaluation; BALANCING PROBLEM; MODEL;
D O I
10.1007/978-3-319-64465-3_21
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The paper presents a performance analysis of a u-shaped assembly line taking into account the competences of multi-skilled workers. This arrangement requires multi-skilled operators to serve on several different processes and machines. A multi-skilled worker can possess many skills at various levels. These competences translate into varying performances of individual operators and as a result on the performance of the whole line. In this paper we use a Hierarchical Competence Model to estimate the performance of a u-shaped assembly line knowing the required and possessed competences.
引用
收藏
页码:209 / 216
页数:8
相关论文
共 50 条
  • [1] Balancing of parallel U-shaped assembly lines
    Kucukkoc, Ibrahim
    Zhang, David Z.
    COMPUTERS & OPERATIONS RESEARCH, 2015, 64 : 233 - 244
  • [2] Improving labor productivity with U-shaped assembly lines
    Aase, GR
    DECISION SCIENCES INSTITUTE, 1997 ANNUAL MEETING, PROCEEDINGS, VOLS 1-3, 1997, : 1257 - 1259
  • [3] Competence-Based Workforce Allocation for Manual Assembly Lines
    Malachowski, Bartlomiej
    Korytkowski, Przemyslaw
    INTELLIGENT SYSTEMS IN PRODUCTION ENGINEERING AND MAINTENANCE, 2019, 835 : 442 - 451
  • [4] Simulation-based Assembly Line Balancing in U-shaped, Parallel U-shaped, and Parallel Adjacent U-shaped Layouts
    Doung, P.
    Sirovetnukul, R.
    Ren, J.
    2020 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM), 2020, : 751 - 755
  • [5] Productivity improvement with parallel adjacent U-shaped assembly lines
    Chutima, P.
    Suchanun, T.
    ADVANCES IN PRODUCTION ENGINEERING & MANAGEMENT, 2019, 14 (01): : 51 - 64
  • [6] Worker Allocation in U-shaped Assembly Lines with Multiple Objectives
    Sirovetnukul, R.
    Chutima, P.
    2009 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2009, : 105 - 109
  • [7] Note. Optimal balancing of U-shaped assembly lines
    Urban, TL
    MANAGEMENT SCIENCE, 1998, 44 (05) : 738 - 741
  • [8] Optimizing the Efficiency of Straight and U-Shaped Robotic Assembly Lines
    Nilakantan, J. Mukund
    Ponnambalam, S. G.
    SWARM, EVOLUTIONARY, AND MEMETIC COMPUTING, SEMCCO 2014, 2015, 8947 : 582 - 595
  • [9] Heuristic for balancing U-shaped assembly lines with parallel stations
    Chen, Sihua
    Plebani, Louis
    JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, 2008, 51 (01) : 1 - 14
  • [10] ULINO: Optimally balancing U-shaped JIT assembly lines
    Scholl, A
    Klein, R
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1999, 37 (04) : 721 - 736