共 50 条
- [32] A heuristic for a batch processing machine scheduled to minimise total completion time with non-identical job sizes INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2004, 24 (7-8): : 615 - 620
- [35] Minimizing the total completion time on a single batch processing machine with non-identical job sizes using ant colony optimization ICIEA 2008: 3RD IEEE CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS, PROCEEDINGS, VOLS 1-3, 2008, : 2211 - 2215
- [36] A Hybrid Ant Colony Optimization to Minimize the Total Completion Time on a Single Batch Processing Machine with Non-identical Job Sizes ICNC 2008: FOURTH INTERNATIONAL CONFERENCE ON NATURAL COMPUTATION, VOL 7, PROCEEDINGS, 2008, : 439 - +
- [38] Improved MILP formulation equipped with valid inequalities for scheduling a batch processing machine with non-identical job sizes OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2022, 112
- [39] Optimization algorithm on batch scheduling with different release time and non-identical job sizes Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2011, 17 (09): : 1944 - 1953