The hydrogeochemistry of the Nickel Rim mine tailings impoundment, Sudbury, Ontario

被引:144
|
作者
Johnson, RH
Blowes, DW [1 ]
Robertson, WD
Jambor, JL
机构
[1] Univ Waterloo, Dept Earth Sci, Waterloo, ON N2L 3G1, Canada
[2] Colorado Sch Mines, Dept Geol & Geol Engn, Golden, CO 80401 USA
基金
加拿大自然科学与工程研究理事会;
关键词
acid mine drainage; sulfide oxidation; geochemical models;
D O I
10.1016/S0169-7722(99)00068-6
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
From 1953 to 1958, mine tailings were deposited in an elevated impoundment at the Nickel Rim mine, an abandoned Ni-Cu mine near Sudbury, Ontario. The oxidation of sulfide minerals, principally pyrrhotite (8 wt.% of tailings), has generated low-pH waters and released high concentrations of Fe (up to 9.8 g/l), SO4 (up to 24 g/l), dissolved metals (1130 mg/l Al; 698 mg/l Ni) and other dissolved constituents. Groundwater flow through the tailings is mainly horizontal with velocities of 4-8 m/yr. Iron, SO4 and Mn are moving at groundwater velocities and a low-pH front (pH less than or equal to 4.5) is moving more slowly than the groundwater velocity. A series of pH zones with pH values of 3.0, 4.1, 5.6 and 6.7 is present within the impoundment. The occurrence of these zones is attributed to the successive dissolution of iron (oxy)hydroxides, aluminum hydroxide and aluminosilicates, siderite and calcite. Concentrations of dissolved metals, including Al, Co, Cr, Ni and Zn are controlled by the pore-water pH, except for Cu, which is controlled by the precipitation of covellite. The dominant secondary minerals are goethite, jarosite and gypsum. Accumulations of gypsum and jarosite in the oxidation zone have been great enough to cement the tailings. The cemented layers limit O-2 diffusion, resulting in longer oxidation times for the tailings. High concentrations of Fe and SO4 presently in the tailings pore-water will discharge from the impoundment for at least 50 years. (C) 2000 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:49 / 80
页数:32
相关论文
共 50 条
  • [21] Remote and in situ photogrammetric history of the Kidd Copper tailings site, Sudbury, Ontario
    Oldershaw, Lindsay
    Morris, Bill
    Slavinski, Heather
    Miles, Brett
    Maclachlan, John
    Bertram, Aaron
    Vajcozki, Sue
    INTERNATIONAL JOURNAL OF REMOTE SENSING, 2012, 33 (20) : 6553 - 6573
  • [22] MICROPROBE STUDIES OF BASE OF SUDBURY NICKEL IRRUPTIVE, ONTARIO, CANADA
    HEWINS, RH
    ECONOMIC GEOLOGY, 1970, 65 (06) : 737 - &
  • [23] Compositional zoning in ore minerals at the Craig mine, Sudbury, Ontario, Canada
    Craig, JR
    Solberg, TN
    CANADIAN MINERALOGIST, 1999, 37 : 1163 - 1176
  • [24] Mine hoists for the nickel rim south project
    Scott, G.
    Gartner, T.
    Hoist and Haul 2005, 2005, 2005 (07): : 251 - 262
  • [25] An alternative upstream method for the Zhelamuqing tailings impoundment construction of a Copper Mine in China
    Wei, Zuoan
    Chen, Yulong
    Yin, Guangzhi
    Yang, Yonghao
    Shu, Weimin
    GEOMECHANICS AND ENGINEERING, 2019, 19 (05) : 383 - 392
  • [26] Characterization of mine tailings in the Cuban nickel industry
    Rodriguez, RL
    Lloret, A
    Ledesma, A
    Candela, L
    ENVIRONMENTAL GEOTECHNICS, VOLS 1-4, 1998, : 353 - 358
  • [27] Discovery, geology and metal zoning of the Nickel Rim Depth deposit, Sudbury, Canada
    Barnett, ES
    NICKEL '96 - MINERAL TO MARKET, 1996, 96 (06): : 131 - 138
  • [28] Borehole geophysical characteristics of the Lady Violet nickel deposit, Sudbury, Ontario
    Elliott, BE
    Mwenifumbo, CJ
    McDowell, G
    PROCEEDINGS OF THE SYMPOSIUM ON THE APPLICATION OF GEOPHYSICS TO ENGINEERING AND ENVIRONMENTAL PROBLEMS, 1999, : 989 - 997
  • [30] VEGETATING URANIUM-MINE TAILINGS AT ELLIOT LAKE, ONTARIO
    MURRAY, D
    MOFFETT, D
    JOURNAL OF SOIL AND WATER CONSERVATION, 1977, 32 (04) : 171 - 174