Research on the risk assessment of IPD mode based on the fuzzy comprehensive evaluation

被引:1
|
作者
Xu, Yongge [1 ]
Lv, Peng [1 ]
机构
[1] Xian Univ Architecture & Technol, Sch Management, Xian, Shaanxi, Peoples R China
关键词
Integrated project delivery; Integration; Risk;
D O I
10.4028/www.scientific.net/AMM.457-458.1181
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Integrated project delivery as a new mode of project management, its ideas of integration guides the future development direction for the construction, but its theory and practice of development is not mature either. There is still a lot of uncertainty in the process of practical application, need to identify and analyze various of risk factors, which provide theoretical basis for that the IPD model are fully used to project management practices.
引用
收藏
页码:1181 / 1184
页数:4
相关论文
共 50 条
  • [31] Risk Assessment of Large Crude Oil Tanks Based on Fuzzy Comprehensive Evaluation Method
    Wu, Gang
    Li, Lifeng
    Zhou, Huiping
    Jiang, Jinxu
    Luo, Jinheng
    Duan, Qingquan
    Zhang, Shuxin
    SIXTH INTERNATIONAL CONFERENCE ON ELECTROMECHANICAL CONTROL TECHNOLOGY AND TRANSPORTATION (ICECTT 2021), 2022, 12081
  • [32] Flood risk assessment based on hydrodynamic model and fuzzy comprehensive evaluation with GIS technique
    Cai, Tian
    Li, Xinyu
    Ding, Xiang
    Wang, Jia
    Zhan, Jian
    INTERNATIONAL JOURNAL OF DISASTER RISK REDUCTION, 2019, 35
  • [33] Risk assessment methodology for Shenyang Chemical Industrial Park based on fuzzy comprehensive evaluation
    Lu Han
    Yonghui Song
    Liang Duan
    Peng Yuan
    Environmental Earth Sciences, 2015, 73 : 5185 - 5192
  • [34] Fire risk assessment in cotton storage based on fuzzy comprehensive evaluation and Bayesian network
    Chen, Jinyue
    Ji, Jie
    Ding, Long
    Wu, Jiansong
    FIRE AND MATERIALS, 2020, 44 (05) : 683 - 692
  • [35] Urban Flood Risk Assessment Based on Dynamic Population Distribution and Fuzzy Comprehensive Evaluation
    Chen, Hao
    Xu, Zongxue
    Liu, Yang
    Huang, Yixuan
    Yang, Fang
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2022, 19 (24)
  • [36] Risk Assessment of Electric Power Construction Project Based on AHP and the Fuzzy Comprehensive Evaluation
    Zhang Xi-rong
    Li Zhi
    Shen Yao-jie
    PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 695 - 702
  • [37] Risk assessment of corroded casing based on analytic hierarchy process and fuzzy comprehensive evaluation
    Sheng-Shan Chen
    Han-Xiang Wang
    Hao Jiang
    Ya-Nan Liu
    Yan-Xin Liu
    Xiao-Xiao Lv
    Petroleum Science, 2021, 18 (02) : 591 - 602
  • [38] Risk Assessment of Accounting Information System Based on AHP and Fuzzy Comprehensive Evaluation Method
    Liu Jiawei
    2011 6TH INTERNATIONAL CONFERENCE ON COMPUTER SCIENCES AND CONVERGENCE INFORMATION TECHNOLOGY (ICCIT), 2012, : 905 - 908
  • [39] Analysis of Risk Assessment and Prevention for Foreign Project Based on Fuzzy Comprehensive Evaluation Method
    Gao Guohui
    2014 SIXTH INTERNATIONAL CONFERENCE ON MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION (ICMTMA), 2014, : 99 - 102
  • [40] Equipment Development Risk Evaluation Based on Fuzzy Comprehensive Evaluation
    苏续军
    荣丽卿
    王亚彬
    史宪铭
    JournalofDonghuaUniversity(EnglishEdition), 2015, 32 (06) : 998 - 1000