MICRO SEISMIC MONITORING OF A BLOCK CAVE: LOGISTICS AND PERFORMANCE MEASUREMENT.

被引:0
|
作者
Morris, Simon [1 ]
Talu, Sami [2 ]
Allison, David [3 ]
机构
[1] Golder Associates NZ, Auckland Off, Auckland, New Zealand
[2] Northparkes Mines, Rio Tinto, Goonumbla, NSW, Australia
[3] Golder Associates, Maidenhead off, Maidenhead, Berks, England
关键词
D O I
暂无
中图分类号
Q14 [生态学(生物生态学)];
学科分类号
071012 ; 0713 ;
摘要
Micro seismic monitoring is the only established way to continuously and remotely monitor cave back progress in block cave mining. A seismic monitoring system represents a substantial capital investment. To maximise the return on this investment, it is important to have a clear understanding of how the system is going to be implemented and managed. A plan for this management should be in place before commissioning of the system. The return on investment in a seismic monitoring system can be framed by information on the performance of the cave and assessment of potentially damaging or harmful rock mass response to mining. This paper addresses the requirements of a system design, and the requirements of the subsequent management of the commissioning process. This includes aspects such as hardware redundancy and the experience of project managers. Following this, attention should be paid to the ongoing management of the seismic system. While advances in automatic processing have been made, a careful gap analysis needs to be performed to determine whether the results of automatic processing is at a sufficiently high confidence level to be used in day to day cave management. This paper discusses the results of a study of automatic processing and points out factors and potential pitfalls to be considered when assessing the locations of seismic events. Effective continuous seismic monitoring requires considerable commitments in terms of maintenance and human resources. This paper highlights and quantifies these commitments.
引用
收藏
页码:981 / 988
页数:8
相关论文
共 50 条
  • [41] The purpose and focus of environmental performance measurement systems in logistics
    Bjorklund, Maria
    Forslund, Helena
    INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2013, 62 (03) : 230 - 249
  • [42] Logistics performance measurement framework for companies with multiple roles
    Irfani, Dian Prama
    Wibisono, Dermawan
    Basri, Mursyid Hasan
    MEASURING BUSINESS EXCELLENCE, 2019, 23 (02) : 93 - 109
  • [43] A research and industry perspective on automotive logistics performance measurement
    Doernhoefer, Martin
    Guenthner, Willibald A.
    INTERNATIONAL JOURNAL OF LOGISTICS MANAGEMENT, 2017, 28 (01) : 102 - 126
  • [44] Performance measurement in-fourth party reverse logistics
    Oz, Halil Hilmi
    Ozyoruk, Bahar
    MEASURING BUSINESS EXCELLENCE, 2023, 27 (04) : 549 - 578
  • [45] Supply chain performance measurement for third party logistics
    Jothimani, Dhanya
    Sarmah, S. P.
    BENCHMARKING-AN INTERNATIONAL JOURNAL, 2014, 21 (06) : 944 - 963
  • [46] Logistics Performance Measurement with Data Envelopment Analysis (DEA)
    Berrisch, Andreas
    Klumpp, Matthias
    Celebi, Dilay
    EUROPEAN SIMULATION AND MODELLING CONFERENCE 2012, 2012, : 337 - +
  • [47] A micro-simulation model for performance evaluation of a logistics platform
    Gattuso, Domenico
    Cassone, Gian Carla
    Pellicano, Domenica Savia
    17TH MEETING OF THE EURO WORKING GROUP ON TRANSPORTATION, EWGT2014, 2014, 3 : 574 - 583
  • [48] Seismic noise monitoring of a small rock block collapse test
    Taruselli, Marco
    Arosio, Diego
    Longoni, Laura
    Papini, Monica
    Zanzi, Luigi
    GEOPHYSICAL JOURNAL INTERNATIONAL, 2021, 224 (01) : 207 - 215
  • [49] Technique of micro-seismic monitoring the height of two zones
    Yu, Ke-Jun
    Luo, Xun
    Zhang, Xing-Min
    Meitiandizhi Yu Kantan/Coal Geology & Exploration, 2002, 30 (01):
  • [50] Fracture monitoring and reservoir evaluation by micro-seismic method
    Li Zheng
    Chang Xu
    Yao ZhenXing
    Wang Yibo
    CHINESE JOURNAL OF GEOPHYSICS-CHINESE EDITION, 2019, 62 (02): : 707 - 719