On the open-shop problem with preemption and minimizing the average completion time

被引:6
|
作者
Bräsel, H
Hennes, H
机构
[1] Otto Von Guericke Univ, D-39106 Magdeburg, Germany
[2] Univ Kaiserslautern, D-67663 Kaiserslautern, Germany
关键词
scheduling; heuristics; modelling;
D O I
10.1016/S0377-2217(03)00249-2
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider an open-shop problem: n jobs have to be processed on m machines where each machine can process at most one job at a time and each job can be processed on at most one machine at a time. The processing times for all operations are given. Preemptions are allowed, that means each operation can be stopped and continued later on. The order of machines for job J(i) is called machine order of job J(i), the order of jobs on machine M-j is called job order on machine M-j In the case of an open-shop problem all machine orders and job orders have to be determined in such a way, that the average completion time is minimized. New models of scheduling problems with preemption are presented which base on models for problems without preemption. Because the considered problem is NP-hard, lower bounds and heuristics are developed. Computational experiments demonstrate the quality of the algorithms. For small numbers of jobs and machines the obtained results are also compared with the optimal solutions determined by an exact algorithm. (C) 2003 Elsevier B.V. All rights reserved.
引用
收藏
页码:607 / 619
页数:13
相关论文
共 50 条
  • [41] Minimizing average completion time in the presence of release dates
    Phillips, C
    Stein, C
    Wein, J
    MATHEMATICAL PROGRAMMING, 1998, 82 (1-2) : 199 - 223
  • [42] Minimizing Average Coflow Completion Time with Decentralized Scheduling
    Luo, Shouxi
    Yu, Hongfang
    Zhao, Yangming
    Wu, Bin
    Wang, Sheng
    Li, Le Min
    2015 IEEE INTERNATIONAL CONFERENCE ON COMMUNICATIONS (ICC), 2015, : 307 - 312
  • [43] MCAA PLANS OPEN-SHOP OFFENSIVE
    不详
    ENGINEERING NEWS-RECORD, 1984, 212 (07): : 46 - 47
  • [44] A START ON OPEN-SHOP PAY DATA
    不详
    ENGINEERING NEWS-RECORD, 1984, 213 (22): : 72 - 72
  • [45] MCAA DROPS OPEN-SHOP OFFICER
    不详
    ENGINEERING NEWS-RECORD, 1984, 213 (13): : 58 - 58
  • [46] BOSTON GIRDS FOR OPEN-SHOP FIGHT
    不详
    ENGINEERING NEWS-RECORD, 1984, 212 (23): : 58 - 58
  • [47] Coordination of the decentralized concurrent open-shop
    Bukchin, Yossi
    Hanany, Eran
    Gerchak, Yigal
    IISE TRANSACTIONS, 2022, 54 (12) : 1172 - 1185
  • [48] Open-shop batch scheduling with identical jobs
    Mosheiov, Gur
    Oron, Daniel
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) : 1282 - 1292
  • [49] Minimizing Total Completion Time Subject to Job Release Dates and Preemption Penalties
    Zhaohui Liu
    T.C. Edwin Cheng
    Journal of Scheduling, 2004, 7 : 313 - 327
  • [50] Minimizing total completion time subject to job release dates and preemption penalties
    Liu, ZH
    Cheng, TCE
    JOURNAL OF SCHEDULING, 2004, 7 (04) : 313 - 327