共 50 条
- [22] Numerical Analysis of Metro Station Construction by Large-Diameter Shield and Pile-Beam-Arch Method ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 : 2711 - +
- [23] Prediction of existing pipeline settlement resulting from the construction of an underground metro station using the pile-beam-arch (PBA) method Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2021, 54 : 65 - 75
- [29] Geometrically nonlinear analysis of servo-control construction for large-span suspen-domes using double control method Huazhong Keji Daxue Xuebao (Ziran Kexue Ban)/Journal of Huazhong University of Science and Technology (Natural Science Edition), 2012, 40 (03): : 89 - 93