共 50 条
- [2] INFLUENCE OF HIGH-RISK AND LARGE-SPAN METRO STATION CONSTRUCTION BY DRIFT-PBA METHOD ON ADJACENT GROUND AND PIPELINES KEY TECHNOLOGIES OF RAILWAY ENGINEERING - HIGH SPEED RAILWAY, HEAVY HAUL RAILWAY AND URBAN RAIL TRANSIT, 2010, : 648 - 653
- [3] Optimization of large-span metro station construction in soft rock strata and control of ground surface subsidence Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2010, 29 (04): : 804 - 813
- [4] An empirical method for predicting ground surface settlement induced by metro station pit in Xiamen Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2019, 52 : 132 - 138
- [5] Analysis of control standard for ground surface settlement in excavating metro station by shield tunnel combined with pile-beam-arch method Yantu Lixue/Rock and Soil Mechanics, 2012, 33 (SUPPL. 2): : 289 - 296
- [8] Study on ground settlement and structural deformation for large span subway station using a new pre-supporting system ROYAL SOCIETY OPEN SCIENCE, 2019, 6 (02):
- [9] Analysis on the Response of Ground Surface Settlement for a Metro Station during Construction Using the Pile-Beam-Arch (PBA) Method Subjected to Pore Pressure GEO-CHINA 2016: EMERGING TECHNOLOGIES IN TUNNEL ENGINEERING, MODELING, DESIGN, CONSTRUCTION, REPAIR, AND REHABILITATION, 2016, (260): : 243 - 250